How Much Does It Cost To Build A Garage In 2024? A UK Guide

 

The cost of building a new garage has risen in the last few years. Naturally, building costs vary by size, type, and complexity, so in this article, we’ll cover the cost of building a garage across various regions in the UK. 

To give you an accurate view of costs, we’ll also compare four different types of garages: a single garage with a flat roof, a single garage with a pitched roof, a double garage with a flat roof, and a double garage with a pitched roof.

 

Building A Garage Construction Cost Calculations

In our calculations, we applied a consistent methodology across different regions. The cost comparisons are based on the garage being an extension appended to an existing dwelling, not building a new detached structure.

The typical sizes of garages in the UK are:

  • Single – 10 x 18 feet (3m × 5.5m, with a gross external area of 16.5m2)
  • Double – 18 x 18 feet (5.5m × 6m, with a gross external area of 33m2)

We have used both of these measurements to calculate the costs in this article.

 

In terms of build specification when using our BuildPartner pricing tool, our pricing calculator gives you three broad options (which can be revised by item at a later point):

  • Low spec is a basic finish; e.g. Leyland, Everest, Wickes.
  • Mid spec is a standard finish; e.g. Dulux, Hamilton, Slim Line.
  • High spec is a high-spec finish; e.g. Farrow & Ball, Fine Line, Siemens.

 

To keep this comparison simple, we have chosen mid spec in all our cost estimations. In addition to this, we have also provided three different benchmarks to show the range you can expect amongst different contractors. These are:

  • Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
  • Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
  • High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.

Cost Of Building A Single Garage With A Flat Roof

 

Here’s a table showing the average building costs of a single garage with a flat roof in the UK:

Single Garage With Flat Roof Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £22,709  £23,234  £26,838  £1,376  £1,408  £1,627 
London £26,878  £30,055  £32,987  £1,629  £1,821  £1,999 
Midlands £22,185  £24,202  £26,219  £1,345  £1,467  £1,589 
North England £21,047  £23,948  £25,944  £1,276  £1,451  £1,572 
Northern Ireland £21,378  £22,960  £24,873  £1,276  £1,392  £1,507 
Scotland £21,708  £23,682  £25,655  £1,316  £1,435  £1,555 
South East £23,835  £26,652  £29,252  £1,445  £1,615  £1,773 
South West £22,450  £25,393  £27,870  £1,376  £1,539  £1,689 
Wales £22,192  £24,815  £26,649  £1,345  £1,504  £1,615 
Average £22,709  £24,993  £27,365  £1,376  £1,515  £1,659 

All costs exclude VAT.

Here’s what the data shows for the cost of building a single garage with a flat roof:

  • It costs 23% more to build a garage in London than in other regions.
  • The minimum cost is £21,047 and the maximum cost is £32,987.
  • The total average cost is £25,023, or £1,516 per square metre.

Cost Of Building A Single Garage With A Pitched Roof

Here’s a table showing the average building costs of a single garage with a pitched roof in the UK:

Single Garage With Pitched Roof Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £26,880  £29,323  £31,767  £1,629  £1,777  £1,925 
London £32,019  £35,803  £39,296  £1,941  £2,170  £2,382 
Midlands £26,170  £28,549  £30,928  £1,586  £1,730  £1,874 
North England £24,686  £28,245  £30,598  £1,496  £1,712  £1,854 
Northern Ireland £25,137  £26,930  £29,174  £1,496  £1,632  £1,768 
Scotland £25,588  £27,914  £30,240  £1,551  £1,692  £1,833 
South East £28,477  £31,842  £34,949  £1,726  £1,930  £2,118 
South West £26,528  £30,056  £32,989  £1,629  £1,822  £1,999 
Wales £26,176  £29,270  £31,497  £1,586  £1,774  £1,909 
Average £26,851  £29,770  £32,382  £1,627  £1,804  £1,963 

All costs exclude VAT.

 

Here’s what the data shows for the cost of building a single garage with a pitched roof:

  • The minimum cost is £24,686 and the maximum cost is £39,296.
  • The total average cost is £29,668, or £2,382 per square metre.

Cost Of Building A Double Garage With A Flat Roof

Here’s a table showing the average building costs of a double garage with a flat roof in the UK:

Double Garage With Flat Roof Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £32,488  £35,442  £38,395  £1,074  £1,172  £1,269 
London £38,620  £43,184  £47,397  £1,277  £1,428  £1,567 
Midlands £31,719  £34,603  £37,487  £1,049  £1,144  £1,239 
North England £30,039  £34,227  £37,079  £993  £1,131  £1,226 
Northern Ireland £30,532  £32,770  £35,501  £1,009  £1,083  £1,174 
Scotland £31,024  £33,844  £36,665  £1,026  £1,119  £1,212 
South East £34,126  £38,159  £41,882  £1,128  £1,261  £1,385 
South West £32,108  £36,328  £39,872  £1,061  £1,201  £1,318 
Wales £31,728  £35,477  £38,119  £1,049  £1,173  £1,260 
Average £32,487  £36,004  £39,155  £1,074  £1,190  £1,294 

All costs exclude VAT.

 

Here’s what the data shows for the cost of building a double garage with a flat roof:

  • The minimum cost is £30,039 and the maximum cost is £47,397.
  • The total average cost is £35,882, or £1,186 per square metre.

 

Cost Of Building A Double Garage With A Pitched Roof

Here’s a table showing the average building costs of a double garage with a pitched roof in the UK:

Double Garage With Pitched Roof Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £39,156  £42,716  £46,276  £1,294  £1,412  £1,530 
London £46,707  £52,227  £57,322  £1,544  £1,727  £1,895 
Midlands £38,076  £41,538  £44,999  £1,259  £1,373  £1,488 
North England £35,840  £41,093  £44,518  £1,185  £1,358  £1,472 
Northern Ireland £36,539  £39,098  £42,356  £1,185  £1,293  £1,400 
Scotland £37,238  £40,624  £44,009  £1,231  £1,343  £1,455 
South East £41,609  £46,526  £51,065  £1,375  £1,538  £1,688 
South West £38,620  £43,784  £48,056  £1,294  £1,447  £1,589 
Wales £38,084  £42,585  £45,859  £1,259  £1,408  £1,516 
Average £39,097  £43,355  £47,162  £1,292  £1,433  £1,559 

All costs exclude VAT.

 

Here’s what the data shows for the cost of building a single garage with a pitched roof:

  • The minimum cost is £35,840 and the maximum cost is £57,322.
  • The total average cost is £43,204, or £1,428 per square metre.

Summary Of The Average Cost To Build A Garage

 

So, how much does it cost to build a new garage in the UK? That depends largely on where you are building. If you’re building a garage in London, it will cost you an average of 23% more, whereas if you’re building in North England, it will cost you around 8% less on average.

Based on the four different types of garages covered in this article, you can expect building a garage to cost on average (when using a mid-benchmark contractor):

  • Single with flat roof – £24,993, or £1,515 per square metre
  • Single with pitched roof – £29,770, or £1,804 per square metre
  • Double with flat roof – £36,004, or £1,190 per square metre
  • Double with pitched roof – £43,355, or £1,433 per square metre

You’ll notice that the cost per square metre decreases as the project size increases due to more efficient resource utilisation and lower average costs, leading to economies of scale.

Please remember that these costs are based on appending an extension to an existing dwelling, not building a new detached structure – and all costs exclude VAT.

Categories
Building Costs Blog

How Much Does It Cost To Build An Extension In 2024? A UK Guide

In the ever-evolving landscape of construction and home improvement, the question of building costs is perennially at the forefront of any designer’s mind—materials, labour, compliance with the latest building regulations, and VAT of course.

Naturally, the cost of building an extension varies by size, type, and complexity, so in this article, we’ll break down the costs across various regions in the UK. We’ll also look at four types of extensions:

  • Single-storey rear extension
  • Double-storey rear extension
  • Ground-floor wrap-around extension
  • Brick porch extension

We’ll explore both the total project costs and costs per square metre. At the end of the article, we’ll summarise with a comparison to give you a holistic view of the costs of building an extension.

Building An Extension Construction Cost Calculations

In our calculations, we applied a consistent methodology across different regions. The cost comparisons are based on the following:

  • The roof of the extension is pitched, not flat.
  • The extension is constructed out of brick/block, not a timber frame.

As far as rooms are concerned, we included the following in our calculations:

  • Single-storey rear extension – dining room, utility room, WC.
  • Double-storey rear extension – dining room, utility room, WC, two bedrooms, an en-suite bathroom, a storage room, small landing.
  • Ground-floor wrap-around extension – dining room, utility room, WC, boot/cloakroom.
  • Brick porch extension – vacant space.


If you’d like to try a demo of our pricing tool,
sign up here.

 

Which rooms you choose ultimately affects the overall cost of the extension. If we were adding a room for a kitchen instead of a dining room in these extensions, we would need to factor in the cost of fitting a kitchen and the appliances – which would bump up the cost.

Important! To keep things simple, we’ve only included the costs to build the extension, not the costs to refurbish and remodel the existing space.

So, when somebody asks “How much does it cost to build an extension?” it depends entirely on the nature of the project.

There’s no single answer.

But by sharing with you the specifications for these examples, you’ll leave with a much clearer idea of the range and average costs. When using our BuildPartner pricing tool, our pricing calculator gives you three broad options (which can be revised by item at a later point):

  • Low spec is a basic finish; e.g. Leyland, Everest, Wickes.
  • Mid spec is a standard finish; e.g. Dulux, Hamilton, Slim Line.
  • High spec is a high-spec finish; e.g. Farrow & Ball, Fine Line, Siemens.

To keep this comparison simple, we have chosen mid spec in all our cost estimations. In addition to this, we have also provided three different benchmarks to show the range you can expect amongst different contractors. These are:

  • Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
  • Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
  • High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.

In short, contractor pricing varies due to factors such as expertise, location, and project intricacies.

 

Cost Of Building A Single-Storey Rear Extension

Here’s a table showing the average building costs of a single-storey rear extension with a gross external area of 30 square metres:

Single-Storey Rear Extension Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £70,600  £77,018  £83,436  £2,353  £2,567  £2,781 
London £81,986  £92,188  £102,408  £2,733  £3,073  £3,414 
Midlands £68,963  £75,232  £81,502  £2,299  £2,508  £2,717 
North England £65,568  £74,576  £80,790  £2,186  £2,486  £2,693 
Northern Ireland £66,730  £71,528  £77,489  £2,186  £2,384  £2,583 
Scotland £67,892  £74,064  £80,236  £2,263  £2,469  £2,675 
South East £74,199  £82,968  £91,062  £2,473  £2,766  £3,035 
South West £69,801  £78,943  £86,645  £2,353  £2,631  £2,888 
Wales £69,003  £77,157  £82,847  £2,300  £2,572  £2,762 
Average £70,527  £78,186  £85,157  £2,350  £2,606  £2,839 

All costs exclude VAT.

Here’s what the data shows for the cost of building a single-storey rear extension:

  • It costs 21% more to build an extension in London than in other regions.
  • The minimum cost is £65,568 and the maximum cost is £102,408.
  • The total average cost is £77,957, or £2,598 per square metre.


Cost Of Building A Double-Storey Rear Extension

Here’s a table showing the average building costs of a double-storey rear extension with a gross external area of 60 square metres:

Double-Storey Rear Extension Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £123,085 £134,276  £145,465  £1,827  £2,238  £2,424 
London £143,207  £160,796  £179,281  £2,387  £2,680  £2,988 
Midlands £120,286  £131,221  £142,156  £2,005  £2,187  £2,369 
North England £114,540  £130,152  £140,998  £1,909  £2,169  £2,350 
Northern Ireland £116,541  £124,952  £135,365  £1,909  £2,083  £2,256 
Scotland £118,542  £129,318  £140,095  £1,976  £2,155  £2,335 
South East £129,236  £144,509  £158,608  £2,154  £2,408  £2,643 
South West £122,295  £137,633  £151,060  £2,051  £2,294  £2,518 
Wales £121,504  £135,864  £145,812  £2,025  £2,264  £2,430 
Average £ 123,113  £136,525  £148,760  £2,027  £2,275  £2,479 

All costs exclude VAT.


Here’s what the data shows for the cost of building a double-storey rear extension:

  • The minimum cost is £114,540, and the maximum cost is £179,281.
  • The total average cost is £136,132, or £2,268 per square metre.

Cost Of Building A Ground-Floor Wrap-Around Extension


Here’s a table showing the average building costs of a
ground-floor wrap-around extension with a gross external area of 35 square metres:

Ground-Floor Wrap-Around Extension Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £84,035  £91,675  £99,314  £2,334  £2,547  £2,759 
London £97,577  £109,621  £122,056  £2,710  £3,045  £3,390 
Midlands £82,103  £89,567  £97,031  £2,281  £2,488  £2,695 
North England £78,096  £88,792  £96,191  £2,169  £2,466  £2,672 
Northern Ireland £79,458  £85,196  £92,295  £2,207  £2,367  £2,564 
Scotland £80,820  £88,167  £95,514  £2,245  £2,449  £2,653 
South East £88,296  £98,731  £108,363  £2,453  £2,743  £3,010 
South West £83,092  £93,967  £103,134  £2,308  £2,610  £2,865 
Wales £82,150  £91,858  £98,619  £2,282  £2,552  £2,739 
Average £83,959  £93,064  £101,391  £2,332  £2,585  £2,816 

All costs exclude VAT.


Here’s what the data shows for the cost of building a ground-floor wrap-around extension:

  • The minimum cost is £78,096, and the maximum cost is £122,056.
  • The total average cost is £92,804, or £2,578 per square metre.


Cost Of Building A Brick Porch

Here’s a table showing the average building costs of a brick porch with a gross external area of five square metres:

Brick Porch Total Average Build Cost Average Cost Per Sq Metre
Low Benchmark Mid Benchmark High Benchmark Low Benchmark Mid Benchmark High Benchmark
East Anglia £5,983  £5,984  £7,071  £952  £1,197  £1,414 
London £6,917  £7,735  £8,489  £1,383  £1,547  £1,698 
Midlands £5,861  £6,394  £6,927  £1,172  £1,279  £1,385 
North England £5,606  £6,344  £6,873  £1,121  £1,269  £1,375 
Northern Ireland £5,693  £6,116  £6,625  £1,121  £1,223  £1,325 
Scotland £5,780  £6,306  £6,831  £1,156  £1,261  £1,366 
South East £6,249  £6,987  £7,669  £1,250  £1,397  £1,534 
South West £5,926  £6,691  £7,343  £1,197  £1,338  £1,469 
Wales £5,868  £6,562  £7,033  £1,174  £1,312  £1,407 
Average £5,851  £6,569  £7,207  £1,170  £1,314  £1,441 

All costs exclude VAT


Here’s what the data shows for the cost of building a brick porch:

  • The minimum cost is £5,606, and the maximum cost is £8,489.
  • The total average cost is £6,584, or £1,317 per square metre.


Summary Of The Average Cost To Build An Extension


So, how much does it cost to build an extension in the UK? Based on the four different extensions we covered, you can expect it to cost on average (when using a mid-benchmark contractor):

  • Single-storey rear extension – £78,186, or £2,606 per square metre.
  • Double-storey rear extension – £136,525, or £2,275 per square metre.
  • Ground-floor wrap-around extension – £93,064, or £2,585 per square metre.
  • Brick porch – £6,569, or £1,314 per square metre.


With the exception of a brick porch, you’ll notice that the cost per square metre decreases as the project size increases due to more efficient resource utilisation and lower average costs, leading to economies of scale.

Please remember that these costs do not include VAT.

By Tommy Crabtree

Categories
Building Costs Blog

UK Building Regulations Cost Guide 2024

The fees and costs when making an application for Building Regulations differ by local council, of which there are 317 in England, 32 in Scotland, 22 in Wales, and 11 in Northern Ireland. In this article, we’ll compare five local authorities in England – one in the North East, North West, South East, South West, and the Midlands.

We’ll also take a look at whose responsibility it is to apply for Building Regulations, the different types of Building Regulations applications, and approved documents.

What Are The Building Regulations?

In England and Wales, Building Regulations comprise 16 approved documents (ranging from A to S), and they cover the following aspects of construction:

Building Regulations and Approved Documents 
Part A – Structure Part J – Fuel
Part B – Fire Safety Part K – On-site Safety
Part C – Contamination and damp Part L – Conservation of Fuel and Power
Part D – Toxicity Part M – Access
Part E – Sound Part N – Glazing
Part F – Ventilation Part O – Overheating
Part G – Hygiene Part P – Electrics
Part H – Drainage Part S – Infrastructure for Charging Electric Vehicles

You can access a merged document on GOV.UK which shows the contents of each approved document. With over 1,500 pages, it’s not for the faint-hearted, though! But it is particularly useful if you need to perform a word search across all documents.

It’s important to remember that these regulations apply only to England and Wales. For Scotland and Northern Ireland, see:

These regulations are enforced by approved safety inspectors to protect people’s safety, health, and welfare in and around buildings.

The Types Of Building Regulations Approval

The three main types of Building Regulations applications are:

  • Full plans applications, where documents and plans are submitted for approval
  • Building notice applications, where work can be carried out without approval
  • Regularisation applications, which is a retrospective application.

A full plans application is for more comprehensive construction projects like buildings and extensions, whereas a building notice application will suffice for more domestic building work and alterations. The latter is a faster process, and work can commence 48 hours after an application has been submitted (except where the work is a commercial project or close to a public sewer).

Regularisation applications are needed in instances where work has already happened but is not compliant; say, for example, a project took place in 2010, but a solicitor is requesting a completion certificate to proceed with a house purchase in 2024.

Even so, you would not be expected to comply with building regulations that have recently been introduced, such as Part S (Infrastructure for Charging Electric Vehicles). It only applies to regulations that were in place at the time.

Important! Homeowners and property owners are legally responsible for ensuring work carried out is done in accordance with Building Regulations.

The owner of the property doesn’t need to get approval if they use a contractor who is registered with a competent person scheme.

Approved document
Full Plan application

Who Can Approve Constructions?

While there is very little difference in cost, property owners now have a choice as to whether they wish to use:

  • a local authority inspector employed by the local council; or
  • an approved inspector from an approved building inspection company.

About one-fifth of approvals are now handled through private building control (PBCs) organisations without any involvement of the local authority. These firms must re-register with the Construction Industry Council every five years.

Any discrepancies or disagreements that cannot be resolved between the PBC and the client must be escalated to the local authority. Only they have the powers of enforcement.

Building Regulations Application Costs

Here is a table showing the cost of Building Regulations applications across five different councils. Please be mindful that Building Regulations costs are much more nuanced. For instance, there are separate costs for loft conversions, replacement windows and doors, commercial properties, and other alterations.

Here, we focus exclusively on a dwelling and an extension (between 10m2 and 40m2).

1 Dwelling (up to 300m2) 

Extension (10m2 to 40m2) 

Local Authority  *Full Plan  Regularisation  Building Notice 
Leeds City Council £950.00 £1,187.50 £650.00
North Somerset Council £790.00 £918.00 £530.00
Maidstone Borough Council £1,134.00 £1,214.22 £809.00
Preston City Council £762.00 Unspecified £510.00
Rutland County Council £817.38 £885.49 £715.20
Average Cost  £859.01  £1,051.30  £642.84 

*Includes plan charge and inspection charge. 

All prices shown include VAT, except in the case of regularisation where VAT is exempt. 

Based on the above councils, the average cost for a full plan application for one dwelling is £860. To get an exact cost, you’ll need to find the information on your local authority’s website.

Some councils, however, are known to charge more, particularly those in Inner London. Westminster City Council sets its charges based on the value of the property. For a property that’s worth £250,000, you’ll pay an eye-watering £2,460.00 for a full plan application (and the same for a building notice charge), and it costs £3,075.00 for a regularisation application.

The higher the property value, the more you pay.

Other councils fail to display all costs on their website. For instance, Liverpool City Council displays application costs for extensions but not new-build dwellings. You will need to contact them directly or fill in an enquiry form to get the answers you need.

What’s The Difference Between Planning Permission And Building Regulations?

Many confuse the Building Regulations approval process with the planning permission approval process. In many instances, you require both.

Remember, Building Regulations is primarily concerned with ensuring that work has been carried out correctly, such as:

  • the structural stability of the building;
  • fire safety measures;
  • the design standards for sanitary pipework and drainage; and
  • the inspection and testing of electrical installations.

Planning permission, however, is concerned with the external appearance of the building, to ensure that a building is in keeping with the local environment. In essence, it’s there to avoid architectural eyesores.

Obtaining A Building Regs Certificate

Once the inspector signs off the project in accordance with Building Regulations, they will issue you with a completion certificate. The property owner must retain this (as well as a copy of the planning permission) if they ever wish to sell. Lenders and property insurers may also request a copy.

You may also need this as proof if you wish to claim VAT on the expense (where applicable).

What happens if you misplace your Building Regulations certificate? Your local authority should be able to provide you with a copy of your certificate or full plans approval notice.

What Happens Once An Application Has Been Sent?

After sending an application to a local authority or a PBC, they will get in touch with the applicant to arrange inspections at various phases of the building project to inspect the property. If the property owner has taken the decision to deviate from the approved plans (which is fairly common), they need to liaise with the local authority or PBC to discuss any implications this has.

Ensure You Comply With The Building Regulations

Suppose your local authority deems the work to be unsatisfactory. In that case, they have the power to order you to pull down the work or serve an enforcement notice to bring it up to standard (which can be served no later than 12 months after the completion of the building work).

If the owner of the property fails to comply with the notice, the local authority can undertake the work itself and recover the associated costs from the owner.

In some cases, this entails prosecution in the Magistrates’ Court where an unlimited fine is imposed (sections 35 and 35A of the Building Act 1984).

Categories
Building Costs Blog

Average Building Costs Per Sq M For 2024 – A UK Guide

Building costs per square metre have reached historic highs over the last couple of years, driven by several factors which we’ll touch on in this article. More specifically, we cover the average cost of building a house per sq metre in 2024 across various regions in the UK.

Rather than providing you with an aggregated figure, we’ve mined the intel from millions of data points to show you the average costs per sq metre for East Anglia, London, the Midlands, North England, the South East, the South West, Wales, Scotland, and Northern Ireland.

Given the volatile rate of inflation and building materials prices, these estimates are constantly changing. We aim to publish a new article every six months to give you the latest insights.

Why Are House-Building Costs Rising?

We covered this at length in a previous article, but to give you a quick overview, building costs have risen sharply over the last couple of years, initially triggered by shortages in the pandemic, and then exacerbated by inflationary pressure.

But even after the effects of the pandemic abated, other economic factors have sustained the high materials prices:

  • The Russia-Ukraine war has led to severe shortages of materials and fuel.
  • Brexit has given rise to shipping delays, a reduction in foreign workers, and a widening trade deficit (the difference between exports and imports).
  • A sustained level of high demand means builders and suppliers can charge more.

It’s doubtful that prices will return to previous levels.

Methodology For Our Construction Cost Calculations

House-building costs vary significantly depending on many factors. For instance, Purple Bricks reports that it costs on average £1,200 to £1,500 per square metre to build a house yet provides no context regarding the specification, location, or size of the dwelling. They’re basing that on a general rule of thumb.

The old adage “How long is a piece of string?” inevitably springs to mind.

In our calculations, we applied a consistent methodology across different regions. We focused on comparing a mid-range specification of a three-bedroom new-build project. The average number of bedrooms in the UK is 2.95 rooms per house, so we rounded it up to 3.

The average total floor area of a dwelling in the UK is 94m2. However, new-build designs generally exceed the average floor area of a UK home. Our data shows that a typical two-storey three-bedroom new build has a gross internal floor area (GIFA) of 110m2 – which we have based our calculation on.

Rooms included in our average costs are three bedrooms, a bathroom, a kitchen, a living room, a dining room, a cloakroom, the hallway and landing, and a dedicated boiler and storage cupboard. A garage was excluded from our calculations since only a third of UK homes have one.

In terms of build specification, our pricing calculator has three options:

·       Low spec is a basic finish; e.g. Leyland, Everest, Wickes.

·       Mid spec is a standard finish; e.g. Dulux, Hamilton, Slim Line.

·       High spec is a high-spec finish; e.g. Farrow & Ball, Fine Line, Siemens.

For the purposes of this comparison of build costs per square metre, we have chosen mid spec.

Average House Build Costs Per Square Metre – By Region

Here’s a table showing the average building costs per square metre for a three-bedroom house in the UK (by region), where:

·       Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.

·       Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.

·       High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.

Cost Per Square Metre Of Building A 3-Bedroom UK House (By Region)

Cost Of Building A 3-Bedroom UK House (By Region) Average Cost Per Sq Metre (excl. VAT)
Low Benchmark Mid Benchmark High Benchmark
East Anglia  £2,386  £2,571  £2,765
London  £2,714  £2,973  £3,287
Midlands  £2,287  £2,495  £2,703
North England  £2,182  £2,477  £2,684
South East  £2,455  £2,678  £2,950
South West  £2,340  £2,552  £2,809
Scotland  £2,260  £2,465  £2,670
Wales  £2,304  £2,513  £2,723
Northern Ireland  £2,136  £2,380  £2,578
UK Average  £2,340  £2,567  £2,797

Average Total Cost Of Building A 3-Bedroom UK House (By Region)

Here’s a table showing the average total building costs for a three-bedroom house in the UK (by region):

Cost Of Building A 3-Bedroom UK House (By Region) Total Average Building Cost (excl. VAT)
Low Benchmark Mid Benchmark High Benchmark
East Anglia  £262,405  £282,771  £304,147
London  £298,486  £327,058  £361,552
Midlands  £251,625  £274,500  £297,375
North England  £239,981  £272,496  £295,204
South East  £270,005  £294,551  £324,474
South West  £257,355  £280,751  £308,949
Scotland  £248,545  £271,140  £293,736
Wales  £253,439  £276,478  £299,518
Northern Ireland  £234,931  £261,798  £283,614
UK Average  £257,419  £282,394  £307,619

Methodology For Ground-Floor Rear Extension Costs

As above, we applied a consistent methodology across different regions when calculating the average cost per square metre for a ground-floor rear extension. 

This single-storey extension has a gross internal floor area of 30m2 (which estimates suggest is the UK average) and comprises three rooms in total: an open-plan kitchen and dining room, and a living room – including the costs of refurbishments in the existing rooms.

Costs Per Square Metre Of Building A Ground-Floor Rear Extension (By Region)

Here’s a table showing the average building costs per square metre for a ground-floor rear extension in the UK (by region):

Cost of building a Ground-Floor Rear extension (By Region) Average Cost Per Sq Metre (excl. VAT)
Low Benchmark Mid Benchmark High Benchmark
East Anglia £2,491 £2,758 £3,024
London £2,897 £3,269 £3,607
Midlands £2,513 £2,742 £2,970
North England £2,416 £2,723 £2,950
South East £2,655 £2,896 £3,181
South West £2,559 £2,792 £3,064
Scotland £2,488 £2,714 £2,940
Wales £2,515 £2,743 £2,972
Northern Ireland £2,416 £2,635 £2,855
UK Average £2,550 £2,808 £3,063

Average Total Cost Of Building A Ground-Floor Rear Extension (By Region)

Here’s a table showing the average total building costs for a ground-floor rear extension in the UK (by region):

Cost Of Building A Ground Floor Rear Extension (By Region) Total Average Building Cost (excl. VAT)
Low Benchmark Mid Benchmark High Benchmark
East Anglia £74,742 £82,744 £90,745
London £86,924 £98,079 £108,228
Midlands £75,408 £82,263 £89,119
North England £72,480 £81,694 £88,501
South East £79,661 £86,903 £95,456
South West £76,792 £83,773 £91,935
Scotland £74,650 £81,436 £88,223
Wales £75,456 £82,316 £89,175
Northern Ireland £72,480 £79,069 £85,658
UK Average £76,510 £84,253 £91,893

Average Cost To Build A House In 2024

So, how much does it cost to build a new house in the UK? That depends largely on where you are building. If you’re building a house in London, the overall cost is around £327,058 (excluding VAT), whereas it’ll cost you an average of £272,496 in North England.

Bear in mind that these are averages and that significant outliers do, in fact, exist. Manchester, for instance, is situated in the Midlands (according to our geographic categorisation; we work on postcode-specific pricing). According to Statista, Manchester has the second-highest residential construction costs per square metre in the UK – second only to London.

Categories
Building Costs Blog

Latest UK Material Costs – July 2023

Hello! We are back again with the latest update on material construction prices in the UK. In our last report we hinted that prices were slightly rising at the beginning of 2023 and to keep an eye on them. 

Well, we’ve gone through the data of the last three months since that report (March, April and May 2023) and we can unfortunately say that prices are rising again!

However, these price rises are in line with inflation which the government is determined to reduce. So in theory prices will peak soon as interest rate rises start having an impact, how soon is hard to say.

So strap in, as we analyse the key points from the latest UK Materials construction prices report (dated July 2023).

Overall UK construction costs

1. Overall construction costs for “All types of construction work” have increased by ~ 3%, since January 2023. The biggest contributors to this were New Housing and Repair and Maintenance work.

2. The biggest MoM (month on month) rise in prices occurred between April 2023 and May 2023, rising approximately 1.3% in just one month! 

Cement and Concrete costs

3. Concrete related products, such as Ready-mixed concrete, pre-cast concrete have risen by approximately 6 – 7% in price since the start of January

4. Blocks and bricks have increased by approximately 5% in price since the start of the year

Other Materials costs

  • Insulation material and kitchen furniture have continued their steady increase in price. With kitchen furniture rising 3% in the last month alone! (April 2023 to May 2023)

Metal Products costs

  • Fabricated structural steel increased  4% since the start of the year, but is starting to trend down again in price.
  • All other metal products have remained equal throughout the year.

 

Timber and Joinery costs

  • Timber and joinery costs remain constant since the start of the year. With no major movements found in doors, plywood and particle boards.

Overview

Overall the main contributors to the increase in construction costs are due to the following materials:

  • Concrete based products
  • Kitchen furniture
  • Insulation material
  • Fabricated structural steel.

All other materials remain constant throughout the start of the year.

 

As always, we’ll be keeping a close eye on prices and keep you in the loop with the latest changes!

 

Best,

Ken Vilaysane, 
Product Manager

Categories
Building Costs Blog

Latest UK Construction Material Costs – March 2023

Our last report, published in January 2023, covered the overall rising costs of construction and material prices across 2022. In that report, we found that although prices had risen by 15% in 2022, they had generally peaked midway through the year and had since started to decrease.

Now that 2023 has begun, how have construction costs fared across the UK? In this report, we analyze the first two months of 2023, giving us some indication of how prices will fare for the coming year.

Spoiler: they’re going up again! (Although slightly)

1. Overall construction costs for “All types of construction work” slightly decreased by 0.8% from December 2022 to January 2023, but February has seen the prices go straight back up again by 0.6%.  The main contributor to this has been an increase in the cost of “Repair and Maintenance” work and “New Housing” work.

2. This has been the first increase in construction material prices since July 2022, when construction costs hit their peak. Could this be the start of a new trend upwards?

3. Insulating materials (including thermal and acoustic) continue to increase! Increasing 15% from December 2022 to February 2023.

Insulating materials have seen the fastest rise out of nearly all construction materials, increasing by approximately 60% since December 2021. For an example looking at Table 1 below to see just how much prices have risen between August 2021 and August 2022.


Table 1 – Insulation prices (August 2021 to August 2022) source: tradinginsulations.co.uk

4. The price of screws increased by 10% from December 2022 to February 2023 , but all other remaining metal based products remain generally stable in price.

The price of screws have been steadily increasing since August 2022, increasing by almost 40% to its current prices. This increase in price has been linked to multiple layers of the supply chain such as the price of raw materials such as steel/nickel and freight shortages.

5. Cement and Concrete products continue their gradual increase in price.

Blocks, bricks, tiles and flagstones, as well as pre-cast concrete products increased the most in this category, with an approximate 10% increase in price from December 2022 to February 2023.

6. Timber and Joinery costs remain stable. No major price fluctuations have been noticed in this category since late 2022. Although it must be noted that there was a slight increase in the price of Imported plywood in February 2023.

Key Takeaways:

  • February has seen the first major increase in material prices since July 2022. Is this going to be an ongoing trend? We’ll need to wait until the next report to see.
  • Watch the price of insulation material and screws as they seem to be increasing at a rapid pace.
  • Stay subscribed to BuildPartner for the latest updates on everything related to Building costs!
Categories
Building Costs Blog

Latest UK Construction Material Costs – January 2023

BuildPartner is aimed at making building prices throughout the UK and beyond as transparent as possible. With this aim we have regularly reported on rising material costs across the UK, the causes of volatility in the market and also how to minimize the variability and risk.

As previously reported 2022 has seen high levels of inflation across all industries and as a result material costs have risen as well. As we look back at 2022, what insights can we pull from the latest UK construction material prices reports? How did 2022 construction costs compare to previous years? And what can we expect moving forwards?

We have summarised 8 key points from the latest UK Construction material prices, released 02 February 2023 supported by BuildPartner’s live price data.

1. Construction costs rose 15% in 2022, compared to 24.5% in 2021 . To put this into perspective , on average construction costs normally rise around 3 – 5% per year. For example, in 2019 there was a 1% decrease in construction costs for that entire year, followed by a 5% increase in costs for 2020. So basically, this isn’t normal.

2. Overall, construction material costs have stabilised, but remain elevated. Since reaching it’s peak in July 2022, we have seen a small reduction in costs with it now stabilising in the last 5 months. This is largely due to a hike in interest rates to cool the level of inflation.

3. However, material costs are still above their long term average. Overall construction material costs have increased by 11.2% from this time last year (December 2021).

4. Insulation materials (thermal or acoustic) have risen the fastest out of all materials by 13% from August 2022 to September 2022. But have since stabilised at this higher rate in the last 4 months.

5. Timber and Joinery materials remain at a stable price. The only major trend can be send from Imported planed and plywood, which has decreased by roughly 25% and is now in line with other timber materials.

6. Cement based products which includes bricks, tiles, cement and concrete continue to rise at roughly 2% per month, with no signs so far of it slowing.
Concrete reinforcing bars however continue to decline in price since peaking in April 2022, but are still elevated by approximately  20%.

7. The price of gravel has increased by roughly 30% since the start of 2022, with it stabilising in price since May 2022.

8. Besides frabricated structural steel, which has seen a continual correction in price since its peak in May, prices for metal products remain stable throughout 2022 and into 2023.

Our thoughts on 2023 prices

The construction industry is facing big headwinds as we likely enter a recession and endure higher interest rates. However, these factors will be countered by the inflationary effects of labour shortages and supply chain issues. As such, we predict prices to remain relatively flat throughout 2023, however dramatic shifts caused by further geopolitical or environment shocks can’t be ruled out.

Written by,

Ken Vilaysane (Product Manager)

 

P.S Did you know Buildpartner has thousands of tasks and materials which we regularly update in response to changing market environments?

You can use these live labour and material rates in your area to create budgets and quotes for your projects.

Try it out by creating a new project here.

Or Book a Demo here.

Categories
Building Costs Blog

Average Building Costs Per Sq M for 2023: A Comprehensive Guide

Are you planning a new home construction or considering a renovation project in 2023? Understanding the average building costs per square metre (sq m) is crucial for budgeting and planning. In this guide, we will provide you with the latest cost per sq m rates for 2023 and the factors affecting these costs.

The Impact of 2022 on Construction Prices

2022 has been a wild ride for construction prices. As reported in our last November construction materials report, skyrocketing inflation, rising interest rates and a looming recession have all contributed to a rise in overall construction costs throughout 2022. Increases in individual construction material prices have differed significantly with some individual items increasing by over 60% while others only increasing by roughly 10% in 2022.

Estimated Building Costs Per Sq M for 2023

Based on the latest material prices in the UK and thousands of quotes assembled in late 2022, here are our best estimations for 2023 construction costs per sq m:

Scope of works

Low benchmark
(excl. VAT)

Average cost
(excl. VAT)

High benchmark
(excl. VAT)

Building a new house

£1,500 £2,000 £3,000

Extension (Ground floor)

£2,000 £2,500 £3,000

Extension (First floor)

£1,250 £1,500 £2,000

Renovation/Remodel

£500 £1,000 £1,250

Factors Affecting Construction Costs Per Sq M

It is important to note that these are rough guidelines in cost. Each project will differ in cost based on a variety of factors such as:

  1. Location: Construction costs typically vary depending on the location. Urban areas like London with scarce land tend to have higher construction costs, while rural areas with more available land generally have lower costs.
  2. Type of finishes (specification): The materials used in construction significantly affect the cost per sq m. High-end materials like marble or granite will increase the cost, while more affordable materials like concrete or vinyl will decrease it. A building with high-end finishes will typically have a higher cost per sq m than one with basic finishes.
  3. Type of Builder: The choice of builder impacts the cost per sq m, with smaller scale builders generally requiring less overhead, while larger, custom builders have higher overhead costs.

Overall, the cost per m2 for construction can vary widely depending on a number of factors. It is important for homeowners and builders to carefully consider these factors and determine a budget that works for their specific project. In general, it is a good idea to get quotes from multiple contractors and compare prices before starting a construction project.

Written by,
Ken Vilaysane
Product Manager at BuildPartner

Tip: Estimating software has come a long way in the last few years, and software such as BuildPartner can help you estimate your project faster and more accurately based on your chosen scope and specification. Our costs take in the latest market trends and rates within your region and breakdown your project costs in seconds. 

Try it out free today by clicking here. No credit card required.

Categories
Building Costs Blog

Latest UK material construction cost trends- November 2022

BuildPartner is aimed at making building prices throughout the UK and beyond as transparent as possible. With this aim we have regularly reported on rising material costs across the UK, the causes of volatility in the market and also how to minimize the variability and risk.

 

As prices across the UK have become increasingly variable due to a variety of factors, we will now be publishing this new regular report depicting the latest changes in construction material prices across the UK. This is aimed at helping builders, architects and their clients gain an understanding of how overall material / construction costs are tracking across the UK and what they should be looking out for.

Here are the top 7 points from the latest UK Construction material prices, released 02 November 2022 supported by BuildPartner’s live price data.

1. Overall, construction material costs are starting to ease. With the average costs rising slightly by 0.7% from August to September, for all types of work. This continues the general trend of a slowdown in the overall material price inflation rate since June 2022.

2. However, material costs are still above their long term average. Overall construction material costs have increased by 16.7% from this time last year (September 2021).

3. Insulation materials (thermal or acoustic) has risen the fastest out of all materials by 13% from August 2022 to September 2022.

4. Timber and Joinery materials are on a general decline in price / generally flat, since peaking in price in the early part of 2022.

5. Cement based products have continued their steady increase in price, rising 2% per month on average.

6. Since March 2022, Gravel, sand, clays and kaolin including Aggregates levy (UK tax on the commercial exploitation of rock, sand and gravel) have increased by nearly 60% in price. However it has recently in the last few months started to stabilise.

7. Metal products increased by 1% in September. Continuing their steady monthly increase in price. Meanwhile fabricated structural steel has continued it’s decrease in price, following it’s peak in May this year.

P.S Did you know Buildpartner has thousands of tasks and materials which we regularly update in responrse to changing market environments?

You can use these live labour and material rates in your area to create budgets and quotes for your projects.

Try it out by creating a new project here.

Or Book a Demo here.

Categories
Building Costs Blog

Why construction costs vary – Part 3 (Natural variability in price)

 

In our final post of our three part series of why construction costs vary per project, we will be discussing the final contributing factor to varying costs, “Natural variability in price”.

 

Reason 3: Natural variability in price.

Having created a relatively fixed scope, and even chosen relatively similar contractors, we know that the prices people receive can still vary. Quite simply this is because prices vary, both through time and between suppliers. We touched upon margin in the previous section, but to add some more detail, a project usually breaks down into five main sections: 

  Building materials 15%

  Fittings and finishes 20%

  Labour 40%

  Prelims 10%

  Overheads and Profit 15%

 

Construction materials

 

These are the core building materials that go into the construction of your project. Such as steel, timber studs, tiles, insulation. Key things which impact their cost are:

  the area of the works

  the demand for particular materials

  the availability of particular materials

  the quality of the materials purchased.

Their prices can vary due to supply and demand, as indeed we’re seeing at the moment but even when they do vary dramatically, say by 10% across the board, that would only be 1.5% of the overall budget, so in our area, it is of little impact. 

 

Fittings and finishes

 

These are the items that are installed in your project that you can see. These might be anything from your timber flooring, to your cooker or bathroom taps. It can be affected by:

  Quality

  Scope

  Organisation

Here we can see much more variability because there is more scope for personal choice. It is easy to spend £1,000, £10,000 or £100,000 on a kitchen as it is to make comparable price increases on tiles, plumbed and wired appliances. This is a common cause of price variability between quotes. Builders will include different allowances or sometimes none at all.

 

Labour

 

This part of the construction budget is what gets paid to the people working to build your project and is usually the most bulky part of the overall cost.

Labour costs commonly vary in price by between 5-15% and will depend on;

  location

  demand

  availability

  efficiency

  quality

As in most markets, more experienced and qualified professionals are paid more. Therefore price variability here, which can be as much as 20-40%, is usually reflective of the standard of the building company you’re working with. Or indeed the standard of work they are used to providing.  

 

Prelims

 

Prelims or preliminary costs are the site specific overheads that your contractor will pay to set up and keep your site operational. This might be the cost for a portable toilet for the contractors to use, or skips to clear site debris.  Another item that might be included is the cost of a project manager or foreman who’s fees to oversee the works would not be covered in the labour costs of the works to be completed.

This section does not vary wildly, if it does it will usually be reflective of 

  The builders specific standards

  Access

  Additional health and safety requirements

  Surrounding areas

  Working hours and amenities

Most important is not to miss things out. Prelims are not always itemized separately in the quotes you will receive from contractors. Sometimes they will be covered in overheads and profit, but it is important to clarify these and who will be carrying the cost for parking, site specific insurance etc. 

 

Overheads and profit  (OHP)

 

To remain a viable business every contractor will need to include an amount of money which will go towards the costs of running their business and create profit for the company.

Business overheads might be items such as insurance, office rent, their admin team.  Profits are necessary for every company to allow them to weather fluxuations in their work and to be able to invest to improve their services such as paying for training new team members and investing in new equipment or practices.

Every contractor will include overheads and profit in their quotes but this will very rarely be explicitly named. It is usually added on as a percentage to individual items of the scope of works and within the labour rates or handling charges provided for additional work.

This is the area which is tweaked according to company specific factors such as

  the risk

  location

  desirability of the project. 

  the size of the contractor

  their interest in getting the job

It can be subject to negotiation as can all prices but is perhaps not as flexible as customers might like. Construction is a competitive business so most contractors know their position in the market and stick to a standardised system. If you want to negotiate, think about what value you can provide them that might lead to a change in price. For example if you’re not in the house things might be easier, if it’s a desirable project for their portfolio or near to their office. These things can be useful and worth reminding your contractor of.

The result is that we see a a during quote variability of 20-30%

At the point at which you have your contractors quoting on your confirmed scope of works at ‘tender’ you will still see a variability in price of between 15-30% based on the natural variability between rates and margins of the contractors. They also can be seen as provisioning different services themselves and so you are now picking one and narrowing down yet again.

 

Conclusion

 

So you can see that when your contractor prepares a price for your project there are lots of aspects to the work that they must consider.

There are several different ways in which contractors can prepare their quotes and strengths and weaknesses to each.

  Some will use an independent estimator or quantity surveyor to value the price of materials and labour on their behalf. This will likely result in a detailed and accurate quote but is often hard to make changes to and their knowledge of the work may need to be checked.

  Some will prepare their prices based on their own calculations and spreadsheets often using a word or excel document, these can be a bit thin on detail as builder’s time is short, they can also be hard to compare as each builder will have a different format.

  So if you’re going to collect quotes yourself, we suggest you use your own list of tasks and specifications. Of course the risk there is that you miss things out so we suggest you use BuildPartner which will guide you through the process, giving you average prices early on, and ensuring you are asked the right questions and can compare quotes easily.

Overall, the most important thing is that your grasp of the scope of work is clear and complete. That will enable you to manage the interdependencies and possibilities.

 

P.S Did you know in Buildpartner you can compare quotes line by line between builders and benchmarks?

Simply click on the quoter page invite builders and view and compare all of their submitted quotes in one place.
Want to know how? Click here