August 28th, 2025
A dormer window offers a straightforward way to improve spatial efficiency, natural light, and overall property value, while also improving kerb appeal. When planning your project, it’s important to think beyond the design and consider the cost implications. Location, roof type, and finish choices can all swing the budget significantly.
But how much does it cost to build a dormer window on an existing property? In this guide, we break down typical installation costs to help you weigh up your options. We’ve included example figures for both flat-roof and pitched-roof dormers to give a clear starting point for budgeting.
Dormer Window Cost Calculations
In our dormer window cost calculations, we’ve included the cost of fitting new radiators under each window to help with heat distribution and reduce cold spots. We also include making good internally with plastering and painting, along with a professional clean once the work is complete.
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of building a dormer window to a standard specification. In addition, we have provided three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
The specification and benchmark you choose will have a major impact on the overall cost, so it’s important to align them with your budget and the level of finish you’re aiming for.
Cost Of Building A Dormer Window With Flat Roof
The table below shows the average cost of building a dormer window with a flat roof to a standard specification:
| Dormer Window – Flat Roof | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £7,494 | £8,379 | £9,197 | £1,873 | £2,095 | £2,299 |
| Greater London | £7,714 | £8,752 | £9,335 | £1,928 | £2,188 | £2,334 |
| Inner London | £7,463 | £8,486 | £8,809 | £1,866 | £2,122 | £2,202 |
| Midlands | £7,009 | £7,837 | £8,602 | £1,752 | £1,959 | £2,150 |
| North England | £7,525 | £8,415 | £9,236 | £1,881 | £2,104 | £2,309 |
| Northern Ireland | £7,234 | £7,793 | £8,767 | £1,786 | £1,948 | £2,192 |
| Scotland | £7,324 | £8,190 | £8,989 | £1,831 | £2,047 | £2,247 |
| South East | £6,974 | £7,755 | £8,652 | £1,895 | £2,107 | £2,326 |
| South West | £7,042 | £8,062 | £8,850 | £1,803 | £2,015 | £2,213 |
| Wales | £6,872 | £7,684 | £8,301 | £1,718 | £1,921 | £2,075 |
| Average | £7,265 | £8,135 | £8,874 | £1,833 | £2,051 | £2,235 |
All costs exclude VAT.
Here’s what the data shows for building a dormer window with a flat roof:
- The minimum cost is £6,872, and the maximum cost is £9,335.
- The total average cost is £8,091, or £2,040 per square metre.
Cost Breakdown By Element – Inner London
The table below shows a detailed breakdown of the typical costs involved in building a dormer window in Inner London. It highlights the main elements, including materials, labour, finishing touches, and contractor overheads and profits.
| Elements | Cost | % |
| Total | £7,684.04 | 100% |
| External wall finishes | £1,677.39 | 21.8% |
| External wall lining | £951.34 | 12.4% |
| Hoarding | £717.07 | 9.3% |
| Professional cleaning | £683.91 | 8.9% |
| External wall structure | £585.23 | 7.6% |
| Radiator under window | £481.91 | 6.3% |
| Roof structure | £362.89 | 4.7% |
| Paint to ceiling | £291.83 | 3.8% |
| Ceiling preparation | £249.13 | 3.2% |
| Roof coverings | £233.85 | 3.0% |
| Rainwater drainage | £229.47 | 3.0% |
| Roof lining | £210.35 | 2.7% |
| Scaffolding | £209.10 | 2.7% |
| Flashing | £203.20 | 2.6% |
| Paint to walls | £177.40 | 2.3% |
| Internal wall preparation | £158.18 | 2.1% |
| Heavy demolition | £121.74 | 1.6% |
| Ceiling lining | £101.58 | 1.3% |
| Medium demolition | £ 38.47 | 0.5% |
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Building A Dormer Window With Pitched Roof
The table below shows the average cost of building a dormer window with a pitched roof to a standard specification:
| Dormer Window – Pitched Roof | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £8,050 | £9,002 | £9,880 | £2,013 | £2,250 | £2,470 |
| Greater London | £8,359 | £9,487 | £10,067 | £2,090 | £2,372 | £2,517 |
| Inner London | £8,034 | £9,125 | £9,486 | £2,009 | £2,281 | £2,371 |
| Midlands | £7,560 | £8,454 | £9,278 | £1,890 | £2,113 | £2,320 |
| North England | £8,087 | £9,043 | £9,925 | £2,022 | £2,261 | £2,481 |
| Northern Ireland | £7,787 | £8,391 | £9,440 | £1,923 | £2,098 | £2,360 |
| Scotland | £7,883 | £8,815 | £9,675 | £1,971 | £2,204 | £2,419 |
| South East | £7,539 | £8,384 | £9,252 | £2,049 | £2,278 | £2,514 |
| South West | £7,592 | £8,694 | £9,544 | £1,944 | £2,173 | £2,386 |
| Wales | £7,407 | £8,283 | £8,948 | £1,852 | £2,071 | £2,237 |
| Average | £7,830 | £8,768 | £9,550 | £1,976 | £2,210 | £2,407 |
All costs exclude VAT.
Here’s what the data shows for the cost of building a dormer window with a pitched roof:
- The minimum cost is £7,407, and the maximum cost is £10,067.
- The total average cost is £8,716, or £2,198 per square metre.
Cost Of Building A Double Dormer Window
The table below shows the average cost of building two dormer windows with pitched roofs to a standard specification:
| Double Dormer Windows – Pitched Roofs | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £13,993 | £15,646 | £17,173 | £ 1,749 | £ 1,956 | £ 2,147 |
| Greater London | £14,578 | £16,546 | £17,549 | £ 1,822 | £ 2,068 | £ 2,194 |
| Inner London | £13,996 | £15,889 | £16,469 | £ 1,750 | £ 1,986 | £ 2,059 |
| Midlands | £13,211 | £14,772 | £16,213 | £ 1,651 | £ 1,847 | £ 2,027 |
| North England | £14,104 | £15,771 | £17,310 | £ 1,763 | £ 1,971 | £ 2,164 |
| Northern Ireland | £13,822 | £15,455 | £16,963 | £ 1,728 | £ 1,932 | £ 2,120 |
| Scotland | £13,794 | £15,424 | £16,929 | £ 1,724 | £ 1,928 | £ 2,116 |
| South East | £13,148 | £14,619 | £16,312 | £ 1,644 | £ 1,827 | £ 2,039 |
| South West | £13,267 | £15,211 | £16,697 | £ 1,658 | £ 1,901 | £ 2,087 |
| Wales | £12,928 | £14,456 | £15,597 | £ 1,616 | £ 1,807 | £ 1,950 |
| Average | £13,684 | £15,379 | £16,721 | £ 1,711 | £ 1,922 | £ 2,090 |
All costs exclude VAT.
Here’s what the data shows for the cost of building two dormer windows with pitched roofs:
- The minimum cost is £12,928, and the maximum cost is £17,549.
- The total average cost is £15,261, or £1,908 per square metre.
Average Cost Of Building A Dormer Window
So, how much does it cost to build a dormer window in the UK? Based on the three types of installations covered in this article, it costs on average (when using a mid-benchmark contractor):
- Dormer window – flat roof: £8,315, or £2,051 per square metre.
- Dormer window – pitched roof: £8,768, or £2,210 per square metre.
- Double dormer windows – pitched roofs: £15,379, or £1,922 per square metre.
It’s also worth noting that these projects were based on a standard specification, so your final cost could be lower or higher depending on the quality of materials you choose.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Please remember that all costs exclude VAT.
Frequently Asked Questions About Building A Dormer Window
Here are some answers to frequently asked questions about installing dormer windows.
How long does it take to install a dormer window?
Installing a dormer window usually takes around two to three weeks from start to finish. The main build involves fitting the dormer frame and window into the roof, followed by moving any central heating or radiator pipework.
Once the window is in place, the interior is plastered, left to dry for several days, and then decorated before the radiator is hung. While the construction itself can take about a week, drying times and decoration mean it’s usually a couple of weeks before the space is ready to use.
What are the different types of dormer windows?
Dormer windows come in several styles, each with its own unique look and purpose:
- Gable-fronted dormer – pitched roof with two sloping sides forming a peak.
- Hip roof dormer – three sloping sides that blend into the roofline.
- Flat roof dormer – flat top, maximising interior space and headroom.
- Shed dormer – single sloping roof extending from the main roof.
- Eyebrow dormer – curved, wave-like roof for a decorative look.
- Arched dormer – rounded top that softens the roofline.
The main types you see in the UK are gable-fronted, flat roof, and shed dormers because they are the most cost-effective and provide extra space.
Do I need guttering on my dormer window?
Guttering is usually recommended for large dormer windows to properly manage rainwater runoff, but they’re not essential on smaller windows as water naturally drains without causing problems. Flat roof dormers are more likely to need guttering to prevent water pooling.
Is scaffolding required to build a dormer window?
Scaffolding is almost always necessary, even if some of the work can be done from the inside. This is because building the dormer involves external tasks like removing roof tiles, cutting rafters, and fitting lead flashing.
UK regulations also mandate scaffolding for prolonged work at height to ensure safety. Additionally, scaffolding makes handling heavy materials like timber and glazing much easier and safer.
How Much Does It Cost To Build A Roof Terrace?
- Post author By ken
- Post date September 15, 2025
- No Comments on How Much Does It Cost To Build A Roof Terrace?
August 28th, 2025
Building a roof terrace or balcony is a great way to make the most of your home’s outdoor space, a place to relax and enjoy great views. But before you start planning, it’s essential to understand the costs involved.
From structural alterations like knocking through walls and installing French doors, to finishing touches such as flooring, painting, and safety features like glass balustrades, the price can vary significantly depending on materials, design, and contractor choice.
In this guide, we break down the average cost of building a roof terrace in the UK, covering basic, standard, and premium specifications, and we also provide cost benchmarks for different regions across the country.
Roof Terrace Cost Calculations
When calculating the cost of a roof terrace on an existing build, there are several additional works to factor in. These often include knocking through an external wall, fitting a patio door, relocating a radiator, laying new carpet and underlay, skimming the wall, and applying a fresh coat of paint.
Our calculations assume that the foundations are already in place, typically above an existing single-storey extension. For safety and style, we’ve calculated the cost using a glass balustrade.
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of building a roof terrace to each specification. In addition, we have provided three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
The specification and benchmark you choose will have a major impact on the overall cost, so it’s important to align them with your budget and the level of finish you’re aiming for.
Cost Of Building A Roof Terrace – Basic Spec
The table below shows the average cost of building a roof terrace to a basic specification:
|
Roof Terrace |
Total Average Build Cost |
Average Cost Per Sq Metre |
||||
|
Low Benchmark |
Mid Benchmark |
High Benchmark |
Low Benchmark |
Mid Benchmark |
High Benchmark |
|
|
East Anglia |
£9,831 |
£10,993 |
£12,065 |
£1,639 |
£1,832 |
£2,011 |
|
Greater London |
£10,091 |
£11,388 |
£12,282 |
£1,682 |
£1,898 |
£2,047 |
|
Inner London |
£10,110 |
£11,372 |
£11,632 |
£1,685 |
£1,895 |
£1,939 |
|
Midlands |
£9,529 |
£10,655 |
£11,695 |
£1,588 |
£1,776 |
£1,949 |
|
North England |
£9,872 |
£11,039 |
£12,116 |
£1,645 |
£1,840 |
£2,019 |
|
Northern Ireland |
£9,650 |
£10,389 |
£11,688 |
£1,587 |
£1,732 |
£1,948 |
|
Scotland |
£9,777 |
£10,933 |
£11,999 |
£1,630 |
£1,822 |
£2,000 |
|
South East |
£9,181 |
£10,208 |
£11,391 |
£1,663 |
£1,849 |
£2,041 |
|
South West |
£9,562 |
£10,854 |
£11,914 |
£1,618 |
£1,809 |
£1,986 |
|
Wales |
£9,417 |
£10,530 |
£11,262 |
£1,570 |
£1,755 |
£1,877 |
|
Average |
£9,702 |
£10,836 |
£11,804 |
£1,631 |
£1,821 |
£1,982 |
All costs exclude VAT but include overheads and profits for contractors.
Here’s what the data shows for building a roof terrace to a basic specification:
- The minimum cost is £9,181, and the maximum cost is £12,282.
- The total average cost is £10,781, or £1,811 per square metre.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Building A Roof Terrace – Standard Spec
The table below shows the average cost of building a roof terrace to a standard specification:
|
Roof Terrace |
Total Average Build Cost |
Average Cost Per Sq Metre |
||||
|
Low Benchmark |
Mid Benchmark |
High Benchmark |
Low Benchmark |
Mid Benchmark |
High Benchmark |
|
|
East Anglia |
£10,521 |
£11,764 |
£12,912 |
£1,753 |
£1,961 |
£2,152 |
|
Greater London |
£10,795 |
£12,159 |
£13,129 |
£1,799 |
£2,027 |
£2,188 |
|
Inner London |
£10,831 |
£12,175 |
£12,434 |
£1,805 |
£2,029 |
£2,072 |
|
Midlands |
£10,219 |
£11,427 |
£12,541 |
£1,703 |
£1,904 |
£2,090 |
|
North England |
£10,562 |
£11,810 |
£12,962 |
£1,760 |
£1,968 |
£2,160 |
|
Northern Ireland |
£10,340 |
£11,142 |
£12,534 |
£1,702 |
£1,857 |
£2,089 |
|
Scotland |
£10,467 |
£11,704 |
£12,846 |
£1,745 |
£1,951 |
£2,141 |
|
South East |
£9,816 |
£10,909 |
£12,047 |
£1,778 |
£1,976 |
£2,182 |
|
South West |
£10,252 |
£11,625 |
£12,760 |
£1,733 |
£1,938 |
£2,127 |
|
Wales |
£10,107 |
£11,301 |
£12,077 |
£1,684 |
£1,884 |
£2,013 |
|
Average |
£10,391 |
£11,602 |
£12,624 |
£1,746 |
£1,949 |
£2,122 |
All costs exclude VAT but include overheads and profits for contractors.
Here’s what the data shows for the cost of building a roof terrace to a standard specification:
- The minimum cost is £9,816, and the maximum cost is £13,129.
- The total average cost is £11,539, or £1,939 per square metre.
Cost Of Building A Roof Terrace – Premium Spec
The table below shows the average cost of building a roof terrace to a premium specification:
|
Roof Terrace |
Total Average Build Cost |
Average Cost Per Sq Metre |
||||
|
Low Benchmark |
Mid Benchmark |
High Benchmark |
Low Benchmark |
Mid Benchmark |
High Benchmark |
|
|
East Anglia |
£11,743 |
£13,130 |
£14,411 |
£1,957 |
£2,188 |
£2,402 |
|
Greater London |
£11,922 |
£13,488 |
£14,630 |
£1,987 |
£2,248 |
£2,438 |
|
Inner London |
£12,112 |
£13,601 |
£13,927 |
£2,019 |
£2,267 |
£2,321 |
|
Midlands |
£11,444 |
£12,797 |
£14,045 |
£1,907 |
£2,133 |
£2,341 |
|
North England |
£11,785 |
£13,178 |
£14,463 |
£1,964 |
£2,196 |
£2,411 |
|
Northern Ireland |
£11,549 |
£12,914 |
£14,174 |
£1,925 |
£2,152 |
£2,362 |
|
Scotland |
£11,689 |
£13,070 |
£14,345 |
£1,948 |
£2,178 |
£2,391 |
|
South East |
£10,939 |
£12,193 |
£13,572 |
£1,823 |
£2,032 |
£2,262 |
|
South West |
£11,476 |
£12,993 |
£14,261 |
£1,913 |
£2,165 |
£2,377 |
|
Wales |
£11,332 |
£12,671 |
£13,524 |
£1,889 |
£2,112 |
£2,254 |
|
Average |
£11,599 |
£13,003 |
£14,135 |
£1,933 |
£2,167 |
£2,356 |
All costs exclude VAT but include overheads and profits for contractors.
Here’s what the data shows for the cost of building a roof terrace to a premium specification:
- The minimum cost is £10,939, and the maximum cost is £14,630.
- The total average cost is £12,913, or £2,152 per square metre.
Average Cost Of Building A Roof Terrace
So, how much does it cost to build a roof terrace in the UK? Based on the three specifications covered in this article, it costs on average (when using a mid-benchmark contractor):
- Roof terrace – basic spec: £10,836, or £1,821 per square metre.
- Roof terrace – standard spec: £11,602, or £1,949 per square metre.
- Roof terrace – premium spec: £13,003, or £2,167 per square metre.
Your final cost of building a roof terrace could be lower or higher depending on the quality of materials you choose and construction methods.
Please note that the costs outlined in this article assume the foundations are already in place, typically above a single-storey extension, and include:
- Knocking through an external wall
- Fitting a patio door
- Relocating a radiator
- Laying new carpet and underlay
- Skimming the wall
- Applying a fresh coat of paint
- Installing a glass balustrade
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
All costs exclude VAT but include overheads and profits for contractors.
Frequently Asked Questions About Building A Roof Terrace
Here are some answers to frequently asked questions about building a roof terrace.
Are there any security concerns with a roof terrace?
On single-storey properties or where the terrace is easily reached from the ground, it can provide easy access to higher windows or doors when using a short ladder.
To improve security, fit strong locks on terrace doors and windows, use toughened glass, and consider motion-activated lighting or CCTV. Designing balustrades and barriers to make climbing difficult can also help reduce risk.
Do green roof terraces need special construction?
A green roof terrace usually features a grassy or planted area to create a garden-like space. The roof must be strong enough to support the extra weight of soil, plants, and retained water.
A high-quality waterproof membrane is also needed to prevent leaks. Not only that, but most green roofs need a drainage system to keep plants healthy and prevent waterlogging.
How can I increase the privacy of a roof terrace?
One of the simplest solutions is to install privacy screens, which can be made from timber, metal, or other durable materials. You can also use frosted glass balustrades to block views while still keeping the terrace feeling open, airy, and light.
Natural solutions like planters and green walls work just as well, creating leafy barriers that add a touch of greenery. Overhead structures like pergolas or canopies provide shelter while reducing visibility from overlooking neighbouring properties.
Do roof terrace lights need to be waterproof?
Any lighting installed on a roof terrace should be rated for outdoor use, with an IP (Ingress Protection) rating suitable for UK weather. An IP65 rating is usually recommended to protect against rain, wind, and dust. But if you’re installing lights flush with the ground where water might pool, opt for IP67, which is rated for temporary submersion.
July 28th, 2025
As demand for home-based workspaces and creative studios continues to rise, garden offices have become a staple of modern residential projects.
While some clients opt for modular or temporary structures, long-term value lies in a properly constructed building, one that won’t rattle or shake in every gale, is well insulated for year-round comfort, keeps pests out, and won’t suffer from damp or leaks.
But how much does it cost to build an office in a garden? In this guide, we’ll break down the installation costs so you can weigh up the options, including with and without a WC and kitchenette that includes:
- Sink with mixer tap
- Base unit with a small worktop
- Under-counter fridge
- Microwave
- Basic storage for cups, cutlery, and dry goods
We also provide a basic example with a felt roof system and engineered wood floor—two straightforward swaps that can help reduce the overall project cost and make the build more budget-friendly.
Garden Office Cost Calculations
The costs in this guide are based on a garden office comprising 12m2. We’ve also included a cost per square metre, so you can easily work out the costs for similar projects.
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of building a garden office to a standard specification. In addition, we have provided three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
The specification and benchmark you choose will have a major impact on the overall cost, so it’s important to align them with your budget and the level of finish you’re aiming for.
Cost Of Building A Garden Office With Kitchenette & WC
The table below shows the average cost of building a garden office that includes a kitchenette and a separate WC:
| Garden Office – With Kitchenette & WC | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £40,821 | £45,645 | £50,098 | £3,402 | £3,804 | £4,175 |
| Greater London | £43,573 | £50,168 | £54,601 | £3,631 | £4,181 | £4,550 |
| Inner London | £44,420 | £50,018 | £51,977 | £3,702 | £4,168 | £4,331 |
| Midlands | £39,605 | £44,285 | £48,606 | £3,300 | £3,690 | £4,050 |
| North England | £38,615 | £43,179 | £47,391 | £3,218 | £3,598 | £3,949 |
| Northern Ireland | £39,723 | £43,138 | £48,530 | £3,295 | £3,595 | £4,044 |
| Scotland | £39,902 | £44,618 | £48,970 | £3,325 | £3,718 | £4,081 |
| South East | £39,592 | £43,983 | £49,119 | £3,586 | £3,984 | £4,401 |
| South West | £39,970 | £46,104 | £50,606 | £3,436 | £3,842 | £4,217 |
| Wales | £38,705 | £43,280 | £46,536 | £3,225 | £3,607 | £3,878 |
| Average | £40,493 | £45,442 | £49,643 | £3,412 | £3,819 | £4,168 |
All costs exclude VAT.
Here’s what the data shows for building a garden office that includes a kitchenette and a separate WC:
- It costs 8% more to build in Inner London.
- The minimum cost is £38,615, and the maximum cost is £54,601.
- The total average cost is £45,193, or £3,800 per square metre.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Building A Garden Office Without Kitchenette & WC
The table below shows the average cost of building a garden office without a kitchenette and a separate WC (as per the example above):
| Garden Office – No Kitchenette or WC | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £28,940 | £32,360 | £35,518 | £2,412 | £2,697 | £2,960 |
| Greater London | £30,789 | £35,507 | £38,523 | £2,566 | £2,959 | £3,210 |
| Inner London | £31,376 | £35,379 | £36,667 | £2,615 | £2,948 | £3,056 |
| Midlands | £28,099 | £31,420 | £34,486 | £2,342 | £2,618 | £2,874 |
| North England | £27,257 | £30,479 | £33,452 | £2,271 | £2,540 | £2,788 |
| Northern Ireland | £28,138 | £30,690 | £34,526 | £2,344 | £2,558 | £2,877 |
| Scotland | £28,144 | £31,471 | £34,541 | £2,345 | £2,623 | £2,878 |
| South East | £27,986 | £31,097 | £34,347 | £2,535 | £2,817 | £3,111 |
| South West | £28,293 | £32,705 | £35,899 | £2,438 | £2,725 | £2,992 |
| Wales | £27,336 | £30,566 | £32,848 | £2,278 | £2,547 | £2,737 |
| Average | £28,636 | £32,167 | £35,081 | £2,415 | £2,703 | £2,948 |
All costs exclude VAT.
Here’s what the data shows for the cost of building a garden office without a kitchenette and a separate WC:
- The minimum cost is £27,251, and the maximum cost is £38,523.
- The total average cost is £31,961, or £2,689 per square metre.
Cost Of Building A Garden Office Using Felt Roof & Laminate Floor
The table below shows the average cost of building a garden office (without WC and kitchenette) using a felt roof system instead of roof tiles, and laminate flooring in place of engineered oak—two straightforward swaps that can help reduce the overall project cost and make the build more budget-friendly.
| Garden Office – With Felt Roof System & Laminate Floor | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £25,962 | £29,030 | £31,862 | £2,163 | £2,419 | £2,655 |
| Greater London | £27,608 | £31,758 | £34,429 | £2,301 | £2,647 | £2,869 |
| Inner London | £28,069 | £31,719 | £32,818 | £2,339 | £2,643 | £2,735 |
| Midlands | £25,178 | £28,154 | £30,901 | £2,098 | £2,346 | £2,575 |
| North England | £24,415 | £27,300 | £29,964 | £2,035 | £2,275 | £2,497 |
| Northern Ireland | £23,927 | £26,754 | £29,364 | £1,994 | £2,230 | £2,447 |
| Scotland | £25,146 | £28,118 | £30,861 | £2,095 | £2,343 | £2,572 |
| South East | £25,062 | £27,876 | £31,092 | £2,088 | £2,323 | £2,591 |
| South West | £25,374 | £29,339 | £32,205 | £2,114 | £2,445 | £2,684 |
| Wales | £24,507 | £27,403 | £29,449 | £2,042 | £2,284 | £2,454 |
| Average | £25,525 | £28,745 | £31,294 | £2,127 | £2,395 | £2,608 |
All costs exclude VAT.
Here’s what the data shows for the cost of building a garden office with a felt roof system (instead of tiles) and using laminate flooring (instead of engineered oak):
- The minimum cost is £23,927, and the maximum cost is £34,429.
- The total average cost is £28,521, or £2,377 per square metre.
Average Cost Of Building A Garden Office
So, how much does it cost to build a garden office in the UK? Based on the three types of installations covered in this article, it costs on average (when using a mid-benchmark contractor):
- Garden Office – With Kitchenette & WC: £45,442, or £3,819 per square metre.
- Garden Office – No Kitchenette or WC: £32,167, or £2,703 per square metre.
- Garden Office – Felt Roof System & Laminate Floor: £28,745, or £2,395 per square metre.
These figures show just how much the total cost can vary depending on the type and scope of your project. Key factors include whether you include a kitchenette or WC, and whether you opt for more affordable finishes like flooring and roofing.
It’s also worth noting that these projects were based on a standard specification, so your final cost could be lower or higher depending on the quality of materials you choose.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes. Please remember that all costs exclude VAT.
Frequently Asked Questions About Building A Garden Office
Here are some answers to frequently asked questions about building a garden office.
Are garden offices cheaper than house extensions or loft conversions?
Garden offices are generally cheaper because they avoid the expensive structural work required for house extensions and loft conversions.
Quite often, their foundations aren’t connected to the main house, so there’s no need to knock through walls or install steel beams and supporting walls, which saves on labour, materials, and the cost of making good plasterwork, painting, flooring, and decoration.
Plumbing is often unnecessary for a garden office, and you’ll likely avoid the time and cost of full planning applications.
Do I need planning permission to build a garden office?
In most cases, garden offices can usually be built under Permitted Development Rights, meaning you don’t need formal planning permission. However, it must be a single storey, take up less than 50% of your garden, and not be used as a separate living space. A height limit of 2.5m applies (if it’s within 2 metres of a boundary).
If your property is listed, in a conservation area, or you plan to run a business with regular visitors, you may need permission. It’s always best to double-check with your local planning authority.
Is it possible to make a garden office completely off-grid?
To make a garden office completely off-grid, you’ll need solar panels with battery storage for power, and a rainwater harvesting and filtration system for potable water (for making hot drinks and washing up).
The biggest challenge is the toilet. Without drainage or plumbing, your only real option is a composting toilet… not exactly everyone’s preferred choice.
Composting toilets use a carbon additive like sawdust to break down waste, but disposal is a bit of a chore. It’s far more convenient to simply pop inside to use the nearest bathroom. As for the internet, your existing Wi-Fi with a signal booster should keep you reliably connected.
What if there is limited access to the garden for construction equipment?
This is a common issue for Victorian terraces and even some newbuilds where the garden is only accessible through the house or a narrow side passage. In most cases, it’s still possible to build a garden office, it just requires a bit more planning.
Many contractors will carry materials through the house and use protective floor coverings to avoid damage. However, limited access can increase labour time and delivery costs slightly, so it’s worth flagging this early during quotes and site surveys.
If carrying out the work during rain, expect mess to be tracked through the house, so additional cleaning and protective measures may be needed to keep the property tidy. It’s also a good idea to factor in the cost of a professional upon completion.
Does a garden office change a property’s council tax band?
A garden room or office usually doesn’t affect the property’s council tax band because it’s considered an outbuilding, not part of your main living space. Council tax bands are based on the internal floor area of the primary residence, so standalone garden offices are typically excluded.
Planning to remove a chimney breast or stack, either in your own home or for a client? Whether you’re opening up space for a modern layout or getting rid for other practical reasons (such as preventing leaks), this guide provides the typical costs associated with chimney breast and chimney stack removal.
We’ll look at the building costs by region and also an itemised breakdown of the associated tasks, including things like:
- Scaffolding for safe access
- Acrow props for temporary structural support
- Demolition and removal of the stack or breast
- Timber hoarding and materials lifts for site logistics
- Roof repairs, including tiles, insulation, and lead flashing
Before reviewing the costs, it’s important to distinguish the two parts of a chimney that are often confused:
- Chimney Breast (Internal) – The part that projects into a room, usually to house a fireplace, running vertically through the inside of the building.
- Chimney Stack (External) – The visible part of the chimney that sits above the roofline. It often contains one or more flues and may serve fireplaces on different floors.
Here’s how the costs typically stack up, along with what you can expect during the removal process, specifically for projects in the UK in 2025.
Chimney Breast Removal Cost Calculations
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the costs according to a standard specification. In addition, we have provided three different benchmarks to show the range of pricing you can expect among different contractors:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
The specification and benchmark you choose will have a major impact on the overall cost of chimney breast and stack removal, so it’s important to align them with both your budget and the level of finish you’re aiming for.
Cost Of Removing A Chimney Stack
The table below shows the average cost of removing a chimney stack in different regions throughout the UK:
| Removal of Chimney Stack & Roof Repair (External) | Total Average Build Cost | ||
| Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £3,739 | £4,181 | £4,589 |
| Greater London | £4,018 | £4,797 | £4,863 |
| Inner London | £4,062 | £4,699 | £4,743 |
| Midlands | £3,611 | £4,038 | £4,432 |
| North England | £3,530 | £3,947 | £4,332 |
| Northern Ireland | £3,703 | £4,614 | £4,101 |
| Scotland | £3,647 | £4,078 | £4,475 |
| South East | £3,614 | £3,994 | £4,484 |
| South West | £3,657 | £4,248 | £4,662 |
| Wales | £3,515 | £3,930 | £4,222 |
| Average | £3,710 | £4,253 | £4,490 |
All costs exclude VAT.
Here’s what the data shows for removing a chimney stack:
- It costs 8% more to remove a chimney stack in Inner London.
- The minimum cost is £3,515, and the maximum cost is £4,863.
- The total average cost is £4,151.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Chimney Stack Removal Elements – Inner London
The table below shows the cost of the associated tasks with removing a chimney stack, for Inner London:
| Task | Specifications | Cost |
| Preliminaries | £3,030 | |
| Skip | 8-yard skip | £384 |
| Materials lift | Geni SLA15 363kg | £282 |
| Timber hoarding | OSB hoarding with built-in door and timber lock | £857 |
| Scaffold roof | Scaffold to roof | £87 |
| Scaffolding to elevations (m2) | Simple Scaffold | £705 |
| Acrow propping (650mm spacing) | Supply and install temporary propping | £716 |
| Demolitions | £825 | |
| Strip out chimney stack above roofline | £825 | |
| Roof structure and coverings | £844 | |
| Timber pitched roof structure | 47x150mm roof rafters @400 c/c | £185 |
| Wood sheathing to roof | 18mm Structural Hardwood Plywood Sheet | £77 |
| Breather membrane to roof | Tyvek Supro breather membrane | £12 |
| Insulation to roof between rafters | 140mm Kingspan Thermaroof TR26 Insulation | £180 |
| Timber battens to roof | 38x38mm timber battens | £97 |
| Cement tiles to roof | Mid spec (PC Supply £22/m2) | £186 |
| Ridge tiles; butt jointed; bedding/pointing | Concrete/cement ridge tile (PC Supply £15/m) | £38 |
| Sand and cement to tiled verge | Sand and cement to tiled verge | £7 |
| Lead flashing | Lead Code 4 – 300mm Roofing Lead Flashing Roll | £63 |
Cost Of Removing Ground Floor Chimney Breast – Single Storey
The table below shows the average cost of removing a chimney breast (single storey) in different regions throughout the UK:
| Ground Floor Chimney Breast Removal – Single Storey (Internal) | Total Average Build Cost | ||
| Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £4,640 | £5,188 | £5,695 |
| Greater London | £4,945 | £5,958 | £6,133 |
| Inner London | £5,047 | £5,871 | £5,935 |
| Midlands | £4,452 | £4,978 | £5,463 |
| North England | £4,351 | £4,865 | £5,340 |
| Northern Ireland | £4,602 | £5,122 | £5,762 |
| Scotland | £4,509 | £5,041 | £5,533 |
| South East | £4,499 | £4,999 | £5,522 |
| South West | £4,522 | £5,263 | £5,777 |
| Wales | £4,336 | £4,848 | £5,223 |
| Average | £4,590 | £5,213 | £5,638 |
All costs exclude VAT.
Here’s what the data shows for removing a chimney breast:
- The minimum cost is £4,336, and the maximum cost is £6,133.
- The total average cost is £5,147.
Chimney Breast Removal Elements – Inner London
The table below shows the cost of the associated tasks with removing a chimney breast, for Inner London:
| Task | Specifications | Cost |
| Preliminaries | £2,238 | |
| Skip | 8 yard skip | £384 |
| Materials lift | Geni SLA15 363kg | £281 |
| Timber hoarding | OSB hoarding, built-in door, timber lock | £857 |
| Acrow propping (650mm spacing) | Supply and install temporary propping | £716 |
| Demolitions | £859 | |
| Strip out chimney breast – 1 storey | £859 | |
| Steel and structural supports | £2,253 | |
| Allowance for steel connections | Allowance for steel connections | £256 |
| Manual handling allowance for steels | £366 | |
| Steel baseplate | Steel baseplate | £146 |
| Steel beam | 203x203x46 UC | £540 |
| Steel column x2 | 203x203x46 UC | £946 |
| External wall structure and lining | £126 | |
| Make good walls after demolition works | Allowance to make good existing walls | £126 |
| Ceiling structure and lining | £244 | |
| Timber ceiling structure | 50×150 C24 joists @400 | £163 |
| Make good ceilings after demolition works | Make good existing ceilings | £41 |
| Single plasterboard to ceiling | 12.5mm standard gyproc plasterboard | £40 |
| Ceiling preparation and finishes | £38 | |
| Skim to ceiling | 3mm Gypsum Thistle multi-finish | £38 |
| Wall preparation and finishes | £113 | |
| Skim to walls | 3mm Gypsum Thistle multi-finish | £113 |
| Total Cost | £5,871 | |
Average Cost Of Removing Chimney Breast & Stack
So, what’s the average cost of removing a chimney breast and chimney stack in the UK? Based on the examples covered in this article, it costs on average (when using a mid-benchmark contractor):
- Removal of chimney stack and roof repair (external): £4,253.
- Ground-floor chimney breast removal – single storey (internal): £5,213.
These figures highlight just how much the total cost can vary depending on your property type and project scope. One additional factor to consider is professional cleaning, especially inside the property. If the chimney breast removal was messy and involved old soot, a professional clean can eliminate lingering odours and improve air quality.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Please remember that all costs exclude VAT.
Frequently Asked Questions About Chimney Deconstruction
Explore answers to frequently asked questions about removing chimney breasts and chimney stacks.
Can I remove just the chimney breast or just the stack?
Some people remove just the stack (above the roof) for safety or leaks, while others remove the breast to gain internal space. Both can be done separately or together.
Will removing a chimney breast affect property value?
Removing a chimney can free up valuable floor space, especially in smaller homes, which many buyers see as a positive. However, if the chimney is connected to a functioning fireplace—particularly in older or Victorian properties—its removal might be seen as a drawback. With the rising cost of fuel, log burners and solid fuel stoves have become very popular again.
Will I need to clean after chimney breast removal?
Chimney breast removal creates a lot of dust and soot. Even with dust sheets and coverings in place, there’s still a risk that dust and soot will spread to other areas of the property. Stubborn soot particles can settle deep into carpets and upholstery, so it’s best to get the professionals in.
What’s the difference between a chimney breast and a chimney stack?
The chimney breast is the part inside the house (often protruding into rooms), while the chimney stack is the external section that sits above the roof.
Do I need to consult the neighbours before removing a chimney breast or stack?
If the chimney breast or stack is part of a party wall, you’ll need to serve notice under the Party Wall Act and may need their written consent. This notice must be given at least two months before the planned work begins.
June 28th, 2025
Underfloor heating is gaining popularity in UK homes due to its energy efficiency and the rising cost of heating bills. It can be up to 25% more efficient than traditional central heating systems with radiators, and up to 40% more efficient when combined with a heat pump. Conservative estimates suggest you could save up to £145 per year.
But how much does it cost to install underfloor heating? In this guide, we’ll break down the installation costs of underfloor heating in the UK for 2025, so you can weigh up the cost benefit versus the potential savings.
Before we begin, it’s important to draw a distinction between the two main types of underfloor heating: wet (water-based) and electric.
- Wet underfloor heating – pipework connected to your central heating and boiler, usually installed by a qualified plumber or heating engineer.
- Electric underfloor heating – uses electric mats or cables, installed and certified by a qualified electrician.
The complexity of installation depends on factors like the type of system, whether it’s a new build or retrofit, the floor construction, and the size of the area.
Additional Factors To Consider For Underfloor Heating Installs
When retrofitting underfloor heating, particularly wet systems, homeowners often underestimate the full cost. It’s not just about laying pipes or cables; the process often involves removing old radiators, capping off plumbing, repairing wall damage, fitting new flooring, and replacing skirting boards and architraves.
For new builds, the process is more straightforward; no demolitions or making good, just the cost of supplying and fitting the system into a new space.
Electric underfloor heating is also popular in upstairs bathrooms, where its thinner profile makes it easier to install without raising floor levels. It usually doesn’t require disturbing existing wall finishes.
Underfloor Heating Conversion Cost Calculations
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of installing underfloor heating to a standard specification. In addition, we have provided three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
The specification and benchmark you choose will have a major impact on the overall cost, so it’s important to align them with both your budget and the level of finish you’re aiming for.
Cost Of Installing Wet Underfloor Heating - Retrofit
The table below shows the average cost of retrofitting wet underfloor heating for a 50m2 layout (i.e., ground floor):
| Wet Underfloor Heating - Retrofit Ground Floor | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £14,294 | £15,984 | £17,543 | £275 | £307 | £337 |
| Greater London | £15,061 | £17,356 | £18,840 | £290 | £334 | £362 |
| Inner London | £15,620 | £17,386 | £18,200 | £300 | £334 | £350 |
| Midlands | £13,857 | £15,495 | £17,007 | £266 | £298 | £327 |
| North England | £13,644 | £15,257 | £16,745 | £262 | £293 | £322 |
| Northern Ireland | £14,212 | £17,275 | £15,356 | £271 | £332 | £295 |
| Scotland | £14,349 | £16,045 | £17,610 | £276 | £309 | £339 |
| South East | £13,820 | £15,249 | £17,145 | £289 | £319 | £355 |
| South West | £14,010 | £16,095 | £17,665 | £277 | £310 | £340 |
| Wales | £13,627 | £15,237 | £16,355 | £262 | £293 | £315 |
| Average | £14,249 | £16,138 | £17,247 | £277 | £313 | £334 |
All costs exclude VAT.
Here’s what the data shows for retrofitting underfloor heating across a 50m² ground-floor layout:
- It costs 7% more to install underfloor heating in Inner London.
- The minimum cost is £13,627, and the maximum cost is £18,840.
- The total average cost is £15,878, or £308 per square metre.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Installing Wet Underfloor Heating - Newbuild
The table below shows the average cost of installing wet underfloor heating in a newbuild home, with a 50m2 layout:
| Wet Underfloor Heating - Newbuild Ground Floor | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £4,991 | £5,581 | £6,126 | £96 | £107 | £118 |
| Greater London | £5,131 | £5,950 | £6,297 | £99 | £114 | £121 |
| Inner London | £5,319 | £5,912 | £6,495 | £102 | £114 | £125 |
| Midlands | £4,745 | £5,306 | £5,824 | £91 | £102 | £112 |
| North England | £4,661 | £5,212 | £5,720 | £90 | £100 | £110 |
| Northern Ireland | £4,890 | £5,889 | £5,235 | £92 | £113 | £101 |
| Scotland | £4,981 | £5,569 | £6,113 | £96 | £107 | £118 |
| South East | £4,724 | £5,282 | £5,797 | £99 | £110 | £121 |
| South West | £4,836 | £5,615 | £6,163 | £97 | £108 | £119 |
| Wales | £4,651 | £5,200 | £5,563 | £89 | £100 | £107 |
| Average | £4,893 | £5,552 | £5,933 | £95 | £108 | £115 |
All costs exclude VAT.
Here’s what the data shows for installing underfloor heating in a newbuild:
- The minimum cost is £4,651, and the maximum cost is £6,495.
- The total average cost is £5,459, or £106 per square metre.
Cost Of Installing Electric Underfloor Heating - Bathroom
The table below shows the average cost of installing electric underfloor heating in a 9m2 bathroom; these costs only include the cost of the heating installation and do not include other elements such as new flooring and making good wall finishes:
| Electric Underfloor Heating - Main Bathroom | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £665 | £743 | £816 | £74 | £83 | £91 |
| Greater London | £707 | £763 | £848 | £79 | £85 | £94 |
| Inner London | £705 | £786 | £862 | £78 | £87 | £96 |
| Midlands | £647 | £723 | £794 | £72 | £80 | £88 |
| North England | £638 | £714 | £783 | £71 | £79 | £87 |
| Northern Ireland | £626 | £699 | £768 | £70 | £78 | £85 |
| Scotland | £664 | £743 | £815 | £74 | £83 | £91 |
| South East | £631 | £705 | £782 | £70 | £78 | £87 |
| South West | £646 | £729 | £800 | £72 | £81 | £89 |
| Wales | £640 | £715 | £769 | £71 | £79 | £85 |
| Average | £657 | £732 | £804 | £73 | £81 | £89 |
All costs exclude VAT.
Here’s what the data shows for retrofitting electric underfloor heating in an existing bathroom:
- The minimum cost is £626, and the maximum cost is £862.
- The total average cost is £732, or £81 per square metre.
Average Cost Of Installing Underfloor Heating
So, how much does it cost to install underfloor heating in the UK? Based on the three types of installations covered in this article, it costs on average (when using a mid-benchmark contractor):
- Wet underfloor heating - retrofit ground floor: £16,138, or £313 per square metre.
- Wet underfloor heating - newbuild ground floor: £5,552, or £108 per square metre.
- Electric underfloor heating - main bathroom (retrofit): £732, or £81 per square metre.
These figures highlight just how much the total cost can vary depending on your project type and scope.
A common assumption is that electric systems are cheaper, but while that may be true for small areas with minimal disruption, in some cases, there’s price parity with wet systems.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Please remember that all costs exclude VAT.
Frequently Asked Questions About Installing Underfloor Heating
Here are some answers to frequently asked questions about installing underfloor heating.
What’s the difference between electric and wet underfloor heating?
Wet systems use hot water pumped through pipes and are cheaper to run but more complex to install. Electric systems use heated cables or mats, are easier to install, but cost more to run.
What's the best type of flooring to use with underfloor heating?
The best flooring for underfloor heating is one that conducts heat well and is stable with temperature changes. Tile and stone are great because they transfer heat efficiently and retain warmth. Engineered wood can also work well. Solid hardwood, however, can warp with changes in temperature and moisture.
Some vinyl and laminate options are suitable, but it’s always worth checking their compatibility with underfloor heating to prevent damage.
Will underfloor heating raise my floor height?
Installing underfloor heating will raise your floor height. Electric systems typically add around 15–30mm, while wet systems can add 30–70mm or more due to pipework and screed layers.
After installing, you may need to adjust or replace skirting boards and architraves to fit the new floor level, and there will often be extra work making good plaster and repainting affected walls.
Is underfloor heating expensive to run?
Electric underfloor heating typically uses 0.1–0.2 kWh per m² per hour, which costs around 3–6p per m² at current electricity rates.
Wet systems are more efficient, using about 0.05–0.1 kWh per m² per hour, and with gas at roughly 8p per kWh, the cost is closer to 0.4–0.8p per m².
That means wet underfloor heating is roughly 7 to 8 times cheaper to run than electric.
What’s the downside of underfloor heating?
With underfloor heating, you lose the option to hang clothes or towels on radiators to dry. You have no available warm surfaces for quick drying, something many of us rely on, particularly in colder months.
How Much Does A Garage Conversion Cost?
- Post author By ken
- Post date June 23, 2025
- No Comments on How Much Does A Garage Conversion Cost?
May 28th, 2025
A garage conversion is a cost-effective way to add extra living space without the hassle of a full extension. But the costs vary depending on the room’s purpose; for instance, converting to a living room or utility room is usually more straightforward, while a new kitchen is more expensive due to plumbing and electrics and the need to install multiple appliances.
In this guide, we’ll break down the typical costs of converting your garage and how the total can vary depending on what you’re turning the space into. We’ll look at the cost of converting a garage by region and review average costs per square metre to help you budget accurately.
Garage Conversion Cost Calculations
The calculations in this guide assume that the existing structure remains in place, with no additional extensions. In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of converting a garage to a standard specification. In addition, we have provided three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
The costs in this guide are based on converting a double garage measuring 32m².
Cost Of Converting A Garage Into A Living Room
The table below shows the average cost of converting a double garage into a standard-spec living room:
| Double Garage/Living Room (Standard Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £10,582 | £11,833 | £12,987 | £331 | £370 | £406 |
| Greater London | £11,528 | £13,313 | £14,372 | £360 | £416 | £449 |
| Inner London | £11,828 | £13,259 | £14,068 | £370 | £414 | £440 |
| Midlands | £10,227 | £11,435 | £12,551 | £320 | £357 | £392 |
| North England | £10,070 | £11,260 | £12,359 | £315 | £352 | £386 |
| Northern Ireland | £10,381 | £11,203 | £12,604 | £321 | £350 | £394 |
| Scotland | £10,492 | £11,732 | £12,876 | £328 | £367 | £402 |
| South East | £10,489 | £11,636 | £13,012 | £356 | £395 | £437 |
| South West | £10,378 | £11,918 | £13,081 | £333 | £372 | £409 |
| Wales | £10,098 | £11,291 | £12,222 | £316 | £353 | £382 |
| Average | £10,607 | £11,888 | £13,013 | £335 | £375 | £410 |
All costs exclude VAT.
Here’s what the data shows for the cost of converting a double garage into a standard-spec living room:
- It costs 10% more to convert a garage in Inner London.
- The minimum cost is £10,070, and the maximum cost is £14,372.
- The total average cost is £11,836, or £373 per square metre.
The costs in this example do not include those associated with relocating the boiler or hot water cylinders.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Converting A Garage Into A Kitchen
The table below shows the average cost of converting a double garage into a standard-spec kitchen:
| Double Garage/Kitchen (Standard Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £24,075 | £26,920 | £29,546 | £752 | £841 | £923 |
| Greater London | £25,259 | £29,313 | £31,742 | £789 | £916 | £992 |
| Inner London | £26,175 | £29,202 | £30,344 | £818 | £913 | £948 |
| Midlands | £23,565 | £26,350 | £28,921 | £736 | £823 | £904 |
| North England | £23,304 | £26,058 | £28,600 | £728 | £814 | £894 |
| Northern Ireland | £23,979 | £25,923 | £29,163 | £743 | £810 | £911 |
| Scotland | £24,196 | £27,056 | £29,695 | £756 | £845 | £928 |
| South East | £23,164 | £25,794 | £28,429 | £787 | £876 | £966 |
| South West | £23,743 | £27,009 | £29,644 | £755 | £844 | £926 |
| Wales | £23,332 | £26,089 | £27,957 | £729 | £815 | £874 |
| Average | £24,079 | £26,971 | £29,404 | £759 | £850 | £927 |
All costs exclude VAT.
Here’s what the data shows for the cost of converting a double garage into a standard-spec kitchen:
- The minimum cost is £23,164, and the maximum cost is £31,742.
- The total average cost is £26,818, or £845 per square metre.
This includes appliances such as an electric hob, extractor fan, oven, fridge, freezer, dishwasher, tumble dryer, washing machine, worktops, and a sink. It doesn’t include costs associated with relocating the boiler or hot water cylinders.
Cost Of Converting A Garage Into A Utility Room
The table below shows the average cost of converting a double garage into a standard-spec utility room:
| Double Garage/Utility Room (Standard Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £12,199 | £13,641 | £14,972 | £381 | £426 | £468 |
| Greater London | £13,087 | £15,170 | £16,315 | £409 | £474 | £510 |
| Inner London | £13,487 | £15,091 | £15,923 | £421 | £472 | £498 |
| Midlands | £11,808 | £13,203 | £14,491 | £369 | £413 | £453 |
| North England | £11,621 | £12,994 | £14,262 | £363 | £406 | £446 |
| Northern Ireland | £11,388 | £12,734 | £13,977 | £356 | £398 | £437 |
| Scotland | £12,179 | £13,619 | £14,947 | £381 | £426 | £467 |
| South East | £11,965 | £13,276 | £14,844 | £374 | £415 | £464 |
| South West | £11,956 | £13,697 | £15,033 | £374 | £428 | £470 |
| Wales | £11,663 | £13,042 | £14,074 | £364 | £408 | £440 |
| Average | £12,135 | £13,647 | £14,884 | £379 | £426 | £465 |
All costs exclude VAT.
Here’s what the data shows for the cost of converting a double garage into a standard-spec utility room:
- The minimum cost is £11,388, and the maximum cost is £16,315.
- The total average cost is £13,555, or £424 per square metre.
This includes worktops, a sink, a tumble dryer, and a washing machine. It doesn’t include costs associated with relocating the boiler or hot water cylinders.
Average Cost Of Converting A Garage
So, how much does it cost to convert a garage in the UK? Based on the three types of garage conversions covered in this article, it costs on average (when using a mid-benchmark contractor):
- Double Garage to a Living Room: £11,888, or £375 per square metre.
- Double Garage to a Utility Room: £13,647, or £426 per square metre.
- Double Garage to a Kitchen: £26,971, or £850 per square metre.
If you’re converting a single garage, simply use the cost per square metre outlined for double garages and adjust based on the size of your space to get a ballpark figure.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Please remember that all costs exclude VAT.
Frequently Asked Questions About Garage Conversions
Explore answers to frequently asked questions about garage conversions.
Will a garage conversion add value to my home?
A garage conversion can increase a property’s value, sometimes by 10–20%, particularly if it creates additional living space such as a bedroom or office. Due to the rise of working from home, many buyers are now looking for exclusive office space.
In areas where off-street parking is limited, some buyers appreciate the security a garage offers. But if the property already has a driveway, the garage may surplus to requirements.
So a conversion can make far better use of the existing space, turning what might otherwise become a dumping ground for old boxes into a functional room.
Do I need building regulations approval for a garage conversion?
Building control must inspect and sign off on the project, which is usually handled by your local authority to ensure that the work meets safety and structural standards.
To convert a garage into living space, you don’t need planning permission as long as the work is internal and doesn’t involve enlarging the structure.
What types of rooms can a garage be converted into?
You can turn a garage into all sorts of useful spaces, depending on what you need. Popular choices include an extra bedroom, home office, playroom, gym, utility room, living room, or even a kitchen or bathroom.
Some options are pretty straightforward, like a bedroom or office, but if you plan to put in a kitchen or bathroom, the costs will be higher, since you’ll need to factor in the cost of plumbing, electrical work, and appliances.
May 28th, 2025
Most houses in the UK are still built with brick, but there is a growing trend towards timber due to its environmental benefits and build efficiency, with around 23% of new homes built being with timber and a whopping 85% in Scotland!
In addition, the UK Government has published a roadmap that outlines efforts to increase timber use in construction, aiming to meet net-zero targets. So, with a growing trend, important to understand cost implications.
In this guide, we’ll break down the typical costs of building a timber-frame home versus a brick/block home. We’ll look at the cost of building by region and review average costs per square metre to help you budget accurately.

Brick & Timber Frame Cost Calculations
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of converting a garage to a standard specification. In addition, we have provided three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
The costs in this guide are based on building a two-storey home comprising 95m². The figures cover the cost of constructing the external shell only and exclude internal finishes, such as kitchens, bathrooms, and flooring.
Cost Of Building A Timber Home
The table below shows the average cost of building a home using a timber frame:
| 3-Bed Detached - Timber | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £194,352 | £217,320 | £238,522 | £2,046 | £2,288 | £2,511 |
| Greater London | £211,159 | £244,465 | £256,137 | £2,223 | £2,573 | £2,696 |
| Inner London | £215,059 | £242,501 | £252,841 | £2,264 | £2,553 | £2,661 |
| Midlands | £188,611 | £210,901 | £231,477 | £1,985 | £2,220 | £2,437 |
| North England | £185,031 | £206,898 | £227,084 | £1,948 | £2,178 | £2,390 |
| Northern Ireland | £190,391 | £206,454 | £232,261 | £1,992 | £2,173 | £2,445 |
| Scotland | £191,532 | £214,167 | £235,062 | £2,016 | £2,254 | £2,474 |
| South East | £190,779 | £212,155 | £236,683 | £2,183 | £2,427 | £2,679 |
| South West | £190,748 | £221,309 | £242,935 | £2,084 | £2,330 | £2,557 |
| Wales | £183,549 | £205,242 | £221,042 | £1,932 | £2,160 | £2,327 |
| Average | £194,121 | £218,141 | £237,404 | £2,067 | £2,316 | £2,518 |
All costs exclude VAT.
Here’s what the data shows for the cost of building a home with a timber frame:
- It costs 9% more to build a timber-framed home in Inner London.
- The minimum cost is £183,549, and the maximum cost is £256,137.
- The total average cost is £216,556, or £2,300 per square metre.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Building A Brick/Block Home
The table below shows the average cost of building a home using brick/block:
| 3-Bed Detached - Brick/Block | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £193,292 | £216,135 | £237,222 | £2,035 | £2,275 | £2,497 |
| Greater London | £208,178 | £246,594 | £253,233 | £2,191 | £2,596 | £2,666 |
| Inner London | £210,823 | £238,631 | £247,456 | £2,219 | £2,512 | £2,605 |
| Midlands | £187,235 | £209,363 | £229,789 | £1,971 | £2,204 | £2,419 |
| North England | £181,899 | £203,396 | £223,239 | £1,915 | £2,141 | £2,350 |
| Northern Ireland | £186,692 | £203,383 | £228,806 | £1,962 | £2,141 | £2,408 |
| Scotland | £186,949 | £209,043 | £229,437 | £1,968 | £2,200 | £2,415 |
| South East | £188,007 | £209,058 | £230,735 | £2,151 | £2,392 | £2,640 |
| South West | £188,933 | £219,603 | £241,063 | £2,068 | £2,312 | £2,538 |
| Wales | £181,444 | £202,888 | £218,388 | £1,910 | £2,136 | £2,299 |
| Average | £191,345 | £215,809 | £233,937 | £2,039 | £2,291 | £2,484 |
All costs exclude VAT.
Here’s what the data shows for the cost of building a home using brick/block:
- The minimum cost is £181,444, and the maximum cost is £253,233.
- The total average cost is £213,697, or £2,271 per square metre.
Comparison Of Stages
The table below shows the costs associated with the different stages of the two types of construction methods:
| Timber | Brick/Block | |||||
| Total | £242,501 | 100.0% | Total | £238,631 | 98.4% | |
| External wall structure and lining | £64,085 | 26.4% | External wall structure and lining | £61,560 | 25.4% | |
| Foundations and substructure | £38,429 | 15.8% | Foundations and substructure | £38,429 | 15.8% | |
| Roof structure and coverings | £35,192 | 14.5% | Roof structure and coverings | £35,192 | 14.5% | |
| Preliminaries | £32,233 | 13.3% | Preliminaries | £34,414 | 14.2% | |
| Floor structure and lining | £24,576 | 10.1% | Floor structure and lining | £21,402 | 8.8% | |
| Drainage and pipework | £15,036 | 6.2% | Drainage and pipework | £15,050 | 6.2% | |
| Internal wall structure and lining | £13,167 | 5.4% | Internal wall structure and lining | £13,167 | 5.4% | |
| Steel and structural supports | £10,762 | 4.4% | Steel and structural supports | £10,396 | 4.3% | |
| Ceiling structure and lining | £3,995 | 1.6% | Ceiling structure and lining | £3,995 | 1.6% | |
| Wiring and fuseboards | £2,777 | 1.1% | Wiring and fuseboards | £2,777 | 1.1% | |
| Demolitions | £1,373 | 0.6% | Demolitions | £1,373 | 0.6% | |
| Heating and cooling | £877 | 0.4% | Heating and cooling | £877 | 0.4% | |
All costs exclude VAT.
- The total cost for the timber build is £242,501, compared to £238,631 for brick/block—making timber about 1.6% more expensive overall.
- External wall structure and lining cost £64,085 (26.4%) for timber, versus £61,560 (25.4%) for brick/block, indicating higher material and fabrication costs for timber frames.
- The floor structure and lining is less expensive in the brick/block build at £21,402 (8.8%), compared to £24,576 (10.1%) in the timber version.
Comparison Of Elements
The table below shows the costs associated with the different elements of the two types of construction methods:
| Timber | Brick/Block | |||||
| Total | £242,501 | 100% | Total | £238,631 | 100% | |
| External wall lining | £26,972 | 11.1% | External wall structure | £48,999 | 20.5% | |
| External wall finishes | £21,020 | 8.7% | External wall finishes | £ - | 0.0% | |
| Foundations | £19,726 | 8.1% | Project management | £20,595 | 8.6% | |
| Project management | £18,532 | 7.6% | Foundations | £19,726 | 8.3% | |
| Floor structure | £18,130 | 7.5% | Floor structure | £14,955 | 6.3% | |
| External wall structure | £16,093 | 6.6% | External wall lining | £12,560 | 5.3% | |
| Roof lining | £12,396 | 5.1% | Roof lining | £12,396 | 5.2% | |
| Structural supports | £10,332 | 4.3% | Internal wall structure | £10,167 | 4.3% | |
| Internal wall structure | £10,167 | 4.2% | Roof coverings | £10,014 | 4.2% | |
| Roof coverings | £10,014 | 4.1% | Structural supports | £9,966 | 4.2% | |
| Excavation | £9,732 | 4.0% | Excavation | £9,732 | 4.1% | |
| Roof structure | £9,263 | 3.8% | Roof structure | £9,263 | 3.9% | |
| Scaffolding | £7,050 | 2.9% | Scaffolding | £7,050 | 3.0% | |
| Waste pipework | £6,486 | 2.7% | Waste pipework | £6,486 | 2.7% | |
| Floor lining | £6,447 | 2.7% | Floor lining | £6,447 | 2.7% | |
| Hardcore | £4,938 | 2.0% | Hardcore | £4,938 | 2.1% | |
| Rainwater drainage | £4,447 | 1.8% | Rainwater drainage | £4,461 | 1.9% | |
| Ceiling lining | £3,995 | 1.6% | Ceiling lining | £3,995 | 1.7% | |
| Internal wall lining | £2,999 | 1.2% | Internal wall lining | £2,999 | 1.3% | |
| Access points | £2,866 | 1.2% | Access points | £2,866 | 1.2% | |
| Waste disposal | £2,304 | 1.0% | Waste disposal | £2,304 | 1.0% | |
| Fascias | £2,250 | 0.9% | Fascias | £2,250 | 0.9% | |
| Reinforcement | £2,170 | 0.9% | Reinforcement | £2,170 | 0.9% | |
| Cabling | £1,732 | 0.7% | Cabling | £1,732 | 0.7% | |
| Machinery / Equipment | £1,632 | 0.7% | Machinery / Equipment | £1,632 | 0.7% | |
| Light demolition | £1,373 | 0.6% | Light demolition | £1,373 | 0.6% | |
| Blinding | £1,263 | 0.5% | Blinding | £1,263 | 0.5% | |
| Hot and cold pipework | £1,237 | 0.5% | Utilities | £1,243 | 0.5% | |
| Utilities | £1,126 | 0.5% | Hot and cold pipework | £1,237 | 0.5% | |
| Pipework | £877 | 0.4% | Pipework | £877 | 0.4% | |
| Hoarding | £857 | 0.4% | Hoarding | £857 | 0.4% | |
| General allowances | £732 | 0.3% | General allowances | £732 | 0.3% | |
| Fuseboards | £723 | 0.3% | Fuseboards | £723 | 0.3% | |
| Flashing | £626 | 0.3% | Flashing | £626 | 0.3% | |
| Damp proofing | £601 | 0.2% | Damp proofing | £601 | 0.3% | |
| Bargeboards | £541 | 0.2% | Bargeboards | £541 | 0.2% | |
| Padstones | £430 | 0.2% | Padstones | £430 | 0.2% | |
| Electrical certification | £321 | 0.1% | Electrical certification | £321 | 0.1% | |
| Roof ventilation | £102 | 0.0% | Roof ventilation | £102 | 0.0% | |
Here are the key takeaways from the cost comparison between timber and brick/block construction:
- Brick/block spends £48,999 (20.5%) on external wall structure—almost double the £25,972 (11.1%) spent in the timber build. However, timber allocates more to internal wall components and finishes.
- No budget is allocated for brick/block for external wall finishes, while timber includes £21,020 for finishes. The brick façade is structural and finish in one, while timber needs cladding added separately.
- Timber shows higher costs in project management (£18,532 vs £15,395) and floor structure (£18,130 vs £14,596) due to the complexity of assembling prefabricated components on site.
- Several elements, such as scaffolding, roof structure, ceiling lining, access points, and fascias, have the exact same costs, showing standardisation across both methods for these elements.
- Timber spends slightly more on roof coverings, floor lining, and internal wall structure, indicating a focus on finish quality and extra insulation needs.
Average Cost Of Building With Brick & Timber
So, what’s the average cost difference of building with brick/block versus timber in the UK? Based on building a two-storey property comprising 95m2, it costs on average (when using a mid-benchmark contractor):
- Two-storey timber-frame build: £218,141, or £2,316 per square metre.
- Two-storey brick/block build: £215,809, or £2,291 per square metre.
So, overall in the housing sector, timber and masonry builds show near price parity once all construction factors are taken into account.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Please remember that all costs exclude VAT.
Frequently Asked Questions About Building With Brick & Timber
Explore answers to frequently asked questions about building with brick/block and timber.
What are the benefits of building with brick and timber?
Brick has a higher thermal mass, meaning it retains heat during the day and releases it slowly, which helps keep your home warm in winter and cooler in summer. It’s also great at blocking out noise, which is great if you live near a road or in a busy area. In addition, brick doesn’t need much looking after and tends to outlast alternatives like timber cladding.
Timber is much better for the environment, with a much lower carbon footprint than brick. It also offers lots of design options, from precise geometrical shells to a variety of looks including clean, contemporary, rustic, traditional, and weathered. It can be quicker to work with, especially if you’re using prefabricated sections.
Are there any fire safety concerns when using timber frames?
Timber is a combustible material, whereas brick and block are non-combustible and therefore fire-resistant. So, fire safety must be carefully planned. Quite often, engineered timber is used, which chars predictably and maintains structural integrity longer when exposed to heat and flames.
Building Regulations typically require additional fire safety measures such as fire-rated cladding, treated timber, and internal fire doors. While sprinklers are only mandared on domestic buildings over 4 storeys or in Wales for new-builds, it’s still a good idea to install them.
How durable is brick and timber construction?
Brick is extremely durable and can last over 100 years with minimal maintenance; it’s also resistant to fire, pests (insects such as woodlice), and weather.
On average, you can expect to replace timber cladding every 20 to 40 years depending on the climate and the type of wood (hardwoods like oak typically last longer than softwoods like pine). If the property is in a damp, coastal, or harsh climate, the timber cladding is likely to need replacing sooner due to exposure to moisture, salt, and weathering.
Why does timber need careful storage on site?
Timber needs to be carefully stored on site unlike brick/block. Once it’s delivered, you’ve got to keep it dry and properly protected. Too much moisture causes warping (especially without airflow), and if it’s not stacked right, it can bend and get scratched.
April 28th, 2025
From tiling and plumbing to fixtures and finishes, the costs to renovate a bathroom renovation vary widely depending on the size of the space and the specifications of the project. This guide breaks down typical bathroom renovation costs in the UK so that you can plan your budget with no nasty surprises.
We look at the cost of fully renovating three common bathroom types: a main bathroom, an ensuite, and a WC. We also break down average renovation costs by UK region and per square metre. One notable exclusion is underfloor heating, as it’s not always essential.
Bathroom Renovation Cost Calculations
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we provide a breakdown of the cost of renovating a bathroom for all three specifications. In addition to this, we also provide three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
Average Cost Of A Bathroom Renovation (Standard Spec)
The table below shows the average cost of renovating a bathroom in the UK to a standard spec:
| Bathroom Renovation (Standard Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £9,292 | £10,390 | £11,404 | £1,549 | £1,732 | £1,901 |
| Greater London | £9,757 | £11,151 | £11,983 | £1,626 | £1,858 | £1,997 |
| Inner London | £10,000 | £11,162 | £11,627 | £1,667 | £1,860 | £1,938 |
| Midlands | £8,959 | £10,018 | £10,996 | £1,493 | £1,670 | £1,833 |
| North England | £8,801 | £9,842 | £10,802 | £1,467 | £1,640 | £1,800 |
| Northern Ireland | £9,116 | £9,930 | £11,171 | £1,517 | £1,655 | £1,862 |
| Scotland | £9,129 | £10,208 | £11,204 | £1,522 | £1,701 | £1,867 |
| South East | £8,925 | £9,863 | £11,072 | £1,617 | £1,787 | £1,984 |
| South West | £9,088 | £10,410 | £11,425 | £1,552 | £1,735 | £1,904 |
| Wales | £8,866 | £9,914 | £10,636 | £1,478 | £1,652 | £1,773 |
| Average | £9,193 | £10,289 | £11,232 | £1,549 | £1,729 | £1,886 |
All costs exclude VAT.
Here’s what the data shows for the cost of renovating a bathroom to a standard spec:
- It costs 7% more to renovate a bathroom in Inner London.
- The minimum cost is £8,801, and the maximum cost is £11,983.
- The total average cost is £10,238, or £1,721 per square metre.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Bathroom Renovation Cost Breakdown By Project Stage – London
Here’s an example of the associated costs for the different stages of renovating a bathroom for a standard-spec project – when using a mid-benchmark contractor in London:
| Total | £11,162 | 100% |
| Plumbed appliances | £3,939 | 35.3% |
| Wall preparation and finishes | £2,345 | 21.0% |
| Floor preparation and finishes | £1,563 | 14.0% |
| Decoration | £1,184 | 10.6% |
| Wired appliances | £809 | 7.2% |
| Fixtures and fittings | £444 | 4.0% |
| Heating and cooling | £336 | 3.0% |
| Demolitions | £275 | 2.5% |
| Preliminaries | £221 | 2.0% |
| Ceiling preparation and finishes | £47 | 0.4% |
Average Cost Of An Ensuite Bathroom Renovation (Standard Spec)
The table below shows the average cost of renovating an ensuite bathroom in the UK to a standard spec:
All costs exclude VAT. Here’s what the data shows for the cost of renovating an ensuite bathroom to a standard spec:
- The minimum cost is £6,296, and the maximum cost is £9,644.
- The total average cost is £8,104, or £2,181 per square metre.
The table below shows the average cost of renovating an ensuite bathroom in the UK to a standard spec:
| En-Suite Renovation (Standard Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £7,352 | £8,221 | £9,023 | £1,961 | £2,192 | £2,406 |
| Greater London | £7,776 | £8,959 | £9,644 | £2,074 | £2,389 | £2,572 |
| Inner London | £7,941 | £8,865 | £9,268 | £2,118 | £2,364 | £2,472 |
| Midlands | £7,061 | £7,895 | £8,665 | £1,883 | £2,105 | £2,311 |
| North England | £6,926 | £7,745 | £8,500 | £1,847 | £2,065 | £2,267 |
| Northern Ireland | £7,203 | £7,826 | £8,805 | £1,913 | £2,087 | £2,348 |
| Scotland | £7,231 | £8,086 | £8,875 | £1,928 | £2,156 | £2,367 |
| South East | £7,090 | £7,834 | £8,701 | £2,055 | £2,271 | £2,522 |
| South West | £7,175 | £8,245 | £9,050 | £1,966 | £2,199 | £2,413 |
| Wales | £6,976 | £7,800 | £8,379 | £1,860 | £2,080 | £2,235 |
| Average | £7,273 | £8,148 | £8,891 | £1,960 | £2,191 | £2,391 |
All costs exclude VAT.
Here’s what the data shows for the cost of renovating an ensuite bathroom to a standard spec:
- The minimum cost is £6,296, and the maximum cost is £9,644.
- The total average cost is £8,104, or £2,181 per square metre.
Average Cost Of A WC Renovation (Standard Spec)
The table below shows the average cost of renovating a WC in the UK to a standard spec:
| WC Renovation (Standard Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £3,071 | £3,434 | £3,769 | £1,422 | £1,590 | £1,745 |
| Greater London | £3,274 | £3,759 | £4,027 | £1,516 | £1,740 | £1,864 |
| Inner London | £3,354 | £3,744 | £3,946 | £1,553 | £1,733 | £1,827 |
| Midlands | £2,949 | £3,297 | £3,619 | £1,365 | £1,526 | £1,675 |
| North England | £2,896 | £3,239 | £3,555 | £1,341 | £1,499 | £1,646 |
| Northern Ireland | £2,838 | £3,174 | £3,483 | £1,314 | £1,469 | £1,613 |
| Scotland | £3,019 | £3,375 | £3,705 | £1,397 | £1,563 | £1,715 |
| South East | £2,992 | £3,310 | £3,712 | £1,385 | £1,532 | £1,719 |
| South West | £3,003 | £3,446 | £3,782 | £1,390 | £1,595 | £1,751 |
| Wales | £2,924 | £3,270 | £3,524 | £1,354 | £1,514 | £1,631 |
| Average | £3,032 | £3,405 | £3,712 | £1,404 | £1,576 | £1,719 |
All costs exclude VAT.
Here’s what the data shows for the cost of renovating a WC to a standard spec:
- The minimum cost is £2,838, and the maximum cost is £4,027.
- The total average cost is £3,383, or £1,566 per square metre.
Average Cost Of Renovating A Bathroom
So, how much does it cost to renovate a bathroom in the UK? Based on the three specifications covered in this article, you can expect a bathroom renovation to cost on average (when using a mid-benchmark contractor):
- Bathroom: £10,289, or £1,729 per square metre.
- En-suite: £8,148, or £2,191 per square metre.
- WC: £3,405, or £1,576 per square metre.
Please remember that all costs exclude VAT.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Frequently Asked Questions About Bathroom Renovation Costs
Here are some frequently asked questions about bathroom renovation costs.
Does changing the bathroom layout increase the cost?
Any deviation from the existing layout pushes up labour costs and extends the schedule. For example, moving a toilet typically involves relocating the soil pipe, which may mean breaking up floors or boxing in new pipe runs.
Similarly, relocating a shower or bath means installing new hot and cold feeds, as well as drainage. Not only that, but structural changes, like moving a wall or window, bring in additional trades such as joiners and bricklayers.
How can I keep costs low when renovating a bathroom?
There are plenty of ways to keep costs under control. The biggest saver is sticking to the existing layout. Keeping toilets, showers, and basins in the same position avoids the need to move pipework.
Also, you don’t need to tile every wall — just the wet areas and a splashback behind the basin. The rest can be plastered and painted with good-quality anti-condensation paint.
If the existing toilet or basin is in decent condition, you might be able to keep it and just replace the taps or seat. With a bit of effort, ceramic surfaces clean up nicely.
How much space do I need for an ensuite?
You can fit a compact ensuite into as little as 1.5m x 1m using space-saving fixtures like corner basins and sliding doors. It won’t be spacious, but it’ll be functional. A typical ensuite is usually around 1.5m x 2.5m (3.75m²), giving enough space for a toilet, basin, and shower.
April 28th, 2025
If you’re planning to remodel your existing space to make way for an open-plan kitchen diner, the total cost can vary widely depending on factors such as the specification, local labour rates, structural work required, and the quality of materials you choose.
In this article, we cover the costs involved in converting your existing kitchen and living room, typically by downsizing the living space, to create a larger, open-plan kitchen diner. From knocking down walls and moving utilities to choosing your units and finishes, we’ll break down what you can expect to spend.
We’ll take a look at the cost of converting a kitchen diner by region, covering London, North England, Scotland, Wales, and Northern Ireland. We’ll also review average costs per square metre to help you budget accurately and avoid overspending.
Kitchen Diner Cost Calculations
The calculations in this guide assume that the existing structure remains in place, with no additional extensions. The cost breakdown includes a full kitchen remodel with all-new appliances—hob, electric oven, fridge, freezer, dishwasher, washing machine, and extractor fan.
It also includes the installation of bifold doors to open up the space between inside and outside for a blended dining experience.
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of converting to a kitchen diner for all three specifications. In addition to this, we have also provided three different benchmarks to show the range of pricing you can expect among different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
Cost Of Kitchen Diner Conversion (Basic Spec)
Below is a table showing the average cost of converting a kitchen diner in the UK to a basic spec:
| Kitchen Diner Conversion (Basic Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £25,792 | £28,840 | £31,654 | £614 | £687 | £754 |
| Greater London | £27,470 | £32,271 | £34,396 | £654 | £768 | £819 |
| Inner London | £28,390 | £31,780 | £33,296 | £676 | £757 | £793 |
| Midlands | £25,026 | £27,983 | £30,714 | £596 | £666 | £731 |
| North England | £24,598 | £27,505 | £30,189 | £586 | £655 | £719 |
| Northern Ireland | £25,722 | £27,934 | £31,425 | £610 | £665 | £748 |
| Scotland | £25,839 | £28,892 | £31,711 | £615 | £688 | £755 |
| South East | £25,169 | £28,108 | £31,225 | £651 | £727 | £799 |
| South West | £25,301 | £29,056 | £31,900 | £619 | £692 | £760 |
| Wales | £24,610 | £27,518 | £29,602 | £586 | £655 | £705 |
| Average | £25,792 | £28,989 | £31,611 | £621 | £696 | £758 |
All costs exclude VAT.
Here’s what the data shows for the cost of converting a kitchen diner to a basic spec:
- It costs 8% more to convert a kitchen diner in Inner London.
- The minimum cost is £24,598, and the maximum cost is £34,396.
- The total average cost is £28,797, or £692 per square metre.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Kitchen Diner Conversion (Standard Spec)
The table below shows the average cost of converting a kitchen diner in the UK to a standard spec:
| Kitchen Diner Conversion (Standard Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £33,824 | £37,821 | £41,511 | £805 | £900 | £988 |
| Greater London | £35,516 | £41,339 | £44,519 | £846 | £984 | £1,060 |
| Inner London | £36,787 | £41,154 | £42,611 | £876 | £980 | £1,015 |
| Midlands | £33,058 | £36,964 | £40,571 | £787 | £880 | £966 |
| North England | £32,630 | £36,486 | £40,046 | £777 | £869 | £953 |
| Northern Ireland | £33,754 | £36,695 | £41,282 | £801 | £874 | £983 |
| Scotland | £33,870 | £37,873 | £41,568 | £806 | £902 | £990 |
| South East | £32,559 | £36,260 | £39,958 | £843 | £938 | £1,034 |
| South West | £33,333 | £38,037 | £41,757 | £810 | £906 | £994 |
| Wales | £32,641 | £36,499 | £39,094 | £777 | £869 | £931 |
| Average | £33,797 | £37,913 | £41,292 | £813 | £910 | £991 |
All costs exclude VAT.
Here’s what the data shows for the cost of converting a kitchen diner to a standard spec:
- The minimum cost is £32,559, and the maximum cost is £44,519.
- The total average cost is £37,667, or £905 per square metre.
Cost Of Kitchen Diner Conversion (Premium Spec)
The table below shows the average cost of converting a kitchen diner in the UK to a premium spec:
| Kitchen Diner Conversion (Premium Spec) |
Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £47,457 | £53,066 | £58,243 | £1,130 | £1,263 | £1,387 |
| Greater London | £49,136 | £57,851 | £60,985 | £1,170 | £1,377 | £1,452 |
| Inner London | £51,041 | £57,018 | £58,475 | £1,215 | £1,358 | £1,392 |
| Midlands | £46,691 | £52,209 | £57,303 | £1,112 | £1,243 | £1,364 |
| North England | £46,264 | £51,731 | £56,778 | £1,102 | £1,232 | £1,352 |
| Northern Ireland | £45,338 | £50,697 | £55,643 | £1,079 | £1,207 | £1,325 |
| Scotland | £47,504 | £53,118 | £58,300 | £1,131 | £1,265 | £1,388 |
| South East | £45,102 | £50,396 | £55,954 | £1,074 | £1,200 | £1,332 |
| South West | £46,966 | £53,282 | £58,489 | £1,118 | £1,269 | £1,393 |
| Wales | £46,275 | £51,744 | £55,207 | £1,102 | £1,232 | £1,314 |
| Average | £47,177 | £53,111 | £57,538 | £1,123 | £1,265 | £1,370 |
All costs exclude VAT.
Here’s what the data shows for the cost of converting a kitchen diner to a premium spec:
- The minimum cost is £45,102, and the maximum cost is £60,985.
- The total average cost is £52,609, or £1,253 per square metre.
Average Cost Of Converting A Kitchen Diner
So, how much does it cost to convert to a kitchen diner in the UK? Based on the three specifications covered in this article, you can expect a kitchen diner conversion to cost on average (when using a mid-benchmark contractor):
- Basic spec: £28,989, or £696 per square metre.
- Standard spec: £37,913, or £910 per square metre.
- Premium spec: £53,111, or £1,265 per square metre.
The costs in this guide exclude extensions. If you’re planning to build an extension to increase the floorspace of your kitchen diner, you should factor in approximately £2,900 per square metre for a ground-floor extension, and £2,400 for a double-storey rear extension.
For more specific information about extension costs, check out this article.
Please remember that all costs exclude VAT.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Frequently Asked Questions About Kitchen Diner Conversions
Here are some frequently asked questions about the costs of converting a kitchen diner.
How long does it take to convert a kitchen diner?
Converting to a kitchen diner takes an average of 3.75 weeks, with an average of two tradespeople carrying out the work. Here’s a rough breakdown of the project:
- Demolitions begin in Week 1 and wrap up by early Week 2.
- Windows and doors are installed in Week 1, followed by internal doors and frames.
- Drainage and pipework start in Week 2, overlapping with heating and cooling.
- Wired appliances are set up in Week 3, alongside ceiling and wall preparation.
- Worktops and kitchen appliances are installed in Week 4.
- Decoration begins in Week 4 and finishes in Week 5, marking the project’s end.

Can I knock through a wall to open up space for a kitchen diner?
Yes, if the wall isn’t load-bearing, it’s usually straightforward. If it’s structural, you’ll need a steel beam (RSJ—rolled steel joist) and Building Regulations approval.
How do I know if a wall is load-bearing?
Here are a few signs that a wall might be load-bearing:
- It feels solid (brick or block rather than stud and plasterboard).
- It’s located in the centre of the house, supporting joists or beams above.
- It runs perpendicular to floor joists.
- There’s another wall or beam directly above it on the upper floor.
- It aligns with beams or support structures in the loft or basement.
The only reliable way to be sure is to consult an experienced builder or structural engineer. They can assess the property’s structure and confirm what support is needed if you plan to remove it.
March 28th, 2025
When remodelling a house, costs can vary widely depending on the scope of work. The first thing to be mindful of is not to confuse remodelling with renovation. A renovation refreshes and restores existing rooms without altering their layout, whereas a remodel involves changing the internal structure—for example, removing walls to create an open-plan living, kitchen, and dining area.
Naturally, remodelling is more expensive. So, how much does it cost to remodel a house in 2025? In this article, we cover the costs of remodelling a 3-bedroom house (90m2 – the average size) comprising the following rooms:
- Kitchen-living-dining room
- Downstairs WC
- Boiler cupboard
- Cloakroom
- Entrance hall
- 3x bedrooms
- Bathroom
- En-suite
The calculations in this guide assume the existing shell remains, with no extensions.
We’ll take a look at the cost of remodelling a house by region, covering London, North England, Scotland, Wales, and Northern Ireland. We’ll also review average costs per square metre to help you budget accurately and avoid overspending.
Remodelling A House Cost Calculations
In terms of build specification, BuildPartner gives you three broad options to choose from:
- Basic spec is a basic finish; e.g., Leyland, Everest, Wickes.
- Standard spec is a standard finish; e.g., Dulux, Hamilton, Slim Line.
- Premium spec is a high-spec finish; e.g., Farrow & Ball, Fine Line, Siemens.
In this article, we’ve provided a breakdown of the cost of remodelling for all three specifications.
In addition to this, we have also provided three different benchmarks to show the range you can expect amongst different contractors. These are:
- Low benchmark – smaller companies are generally lower cost but less specialised and with low project management function; good for low/mid-spec projects and tight budgets.
- Mid benchmark – medium-sized companies offer a balanced mix of cost-effectiveness and specialisation; good for mid-range projects for effective execution within moderate budgets.
- High benchmark – larger companies generally have a higher cost base but can handle a wide variety of specialist tasks; good for mid/high-spec projects and project management.
Cost Of Remodelling A Three-Bed House (Basic Spec)
Below is a table showing the average cost of remodelling a three-bedroom house in the UK to a basic spec:
| 3-Bed Remodel (90m2) – Basic Spec | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £118,891 | £132,941 | £145,911 | £1,321 | £1,477 | £1,621 |
| Greater London | £127,609 | £143,967 | £157,890 | £1,418 | £1,600 | £1,754 |
| Inner London | £130,838 | £146,508 | £154,460 | £1,454 | £1,628 | £1,716 |
| Midlands | £114,363 | £127,878 | £140,354 | £1,271 | £1,421 | £1,559 |
| North England | £112,356 | £125,635 | £137,892 | £1,248 | £1,396 | £1,532 |
| Northern Ireland | £116,891 | £125,937 | £141,679 | £1,283 | £1,399 | £1,574 |
| Scotland | £118,341 | £132,327 | £145,236 | £1,315 | £1,470 | £1,614 |
| South East | £116,435 | £130,195 | £144,450 | £1,406 | £1,572 | £1,726 |
| South West | £116,021 | £133,660 | £146,724 | £1,328 | £1,485 | £1,630 |
| Wales | £112,488 | £125,782 | £135,727 | £1,250 | £1,398 | £1,508 |
| Average | £118,423 | £132,483 | £145,032 | £1,329 | £1,485 | £1,624 |
All costs exclude VAT.
Here’s what the data shows for the cost of remodelling a three-bed house to a basic spec:
- It costs 9% more to remodel a house in Inner London than in other parts of the country.
- The minimum cost is £112,356, and the maximum cost is £157,890.
- The total average cost is £131,890, or £1,479 per square metre.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Cost Of Remodelling A Three-Bed House (Standard Spec)
Below is a table showing the average cost of remodelling a three-bedroom house to a standard spec:
| 3-Bed Remodel (90m2) – Mid Spec | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £136,531 | £152,667 | £167,561 | £1,517 | £1,696 | £1,862 |
| Greater London | £145,482 | £164,111 | £179,784 | £1,616 | £1,823 | £1,998 |
| Inner London | £149,280 | £167,035 | £174,987 | £1,659 | £1,856 | £1,944 |
| Midlands | £132,003 | £147,604 | £162,004 | £1,467 | £1,640 | £1,800 |
| North England | £129,997 | £145,360 | £159,541 | £1,444 | £1,615 | £1,773 |
| Northern Ireland | £134,532 | £145,181 | £163,328 | £1,479 | £1,613 | £1,815 |
| Scotland | £135,981 | £152,052 | £166,886 | £1,511 | £1,689 | £1,854 |
| South East | £132,664 | £148,342 | £162,815 | £1,602 | £1,792 | £1,966 |
| South West | £133,661 | £153,386 | £168,374 | £1,524 | £1,704 | £1,871 |
| Wales | £130,129 | £145,508 | £156,575 | £1,446 | £1,617 | £1,740 |
| Average | £136,026 | £152,124 | £166,186 | £1,527 | £1,705 | £1,862 |
All costs exclude VAT.
Here’s what the data shows for the cost of remodelling a three-bed house to a standard spec:
- The minimum cost is £129,997, and the maximum cost is £179,784.
- The total average cost is £151,445, or £1,698 per square metre.
Cost Of Remodelling A Three-Bed House (Premium Spec)
Below is a table showing the average cost of remodelling a three-bedroom house to a premium spec:
| 3-Bed Remodel (90m2) – Premium Spec | Total Average Build Cost | Average Cost Per Sq Metre | ||||
| Low Benchmark | Mid Benchmark | High Benchmark | Low Benchmark | Mid Benchmark | High Benchmark | |
| East Anglia | £168,958 | £188,926 | £207,358 | £1,877 | £2,099 | £2,304 |
| Greater London | £177,677 | £201,196 | £219,336 | £1,974 | £2,236 | £2,437 |
| Inner London | £183,181 | £204,768 | £212,720 | £2,035 | £2,275 | £2,364 |
| Midlands | £164,430 | £183,863 | £201,801 | £1,827 | £2,043 | £2,242 |
| North England | £162,424 | £181,619 | £199,338 | £1,805 | £2,018 | £2,215 |
| Northern Ireland | £159,175 | £177,987 | £195,351 | £1,769 | £1,978 | £2,171 |
| Scotland | £168,408 | £188,311 | £206,683 | £1,871 | £2,092 | £2,296 |
| South East | £162,497 | £181,701 | £201,595 | £1,806 | £2,019 | £2,240 |
| South West | £166,088 | £189,645 | £208,170 | £1,845 | £2,107 | £2,313 |
| Wales | £162,556 | £181,767 | £194,897 | £1,806 | £2,020 | £2,166 |
| Average | £167,539 | £187,978 | £204,725 | £1,862 | £2,089 | £2,275 |
All costs exclude VAT.
Here’s what the data shows for the cost of remodelling a three-bed house to a premium spec:
- The minimum cost is £159,175, and the maximum cost is £219,336.
- The total average cost is £186,747, or £2,075 per square metre.
Summary Of The Average Cost To Remodel A House
So, how much does it cost to remodel a house in the UK? Based on the three specifications covered in this article, you can expect remodelling a house to cost on average (when using a mid-benchmark contractor):
- Basic spec: £132,483, or £1,485 per square metre.
- Standard spec: £152,124, or £1,705 per square metre.
- Premium spec: £187,978, or £2,089 per square metre.
The costs in this guide exclude extensions. If you’re planning to build an extension, you should factor in approximately £2,900 per square metre for a ground-floor extension, and £2,400 for a double-storey rear extension. For more specific information about extension costs, check out this article.
Please remember that all costs exclude VAT.
Start your free trial with BuildPartner to get a bespoke estimate of your construction project within minutes.
Frequently Asked Questions About Remodelling A House
Here are some frequently asked questions about remodelling a house.
How long does it take to remodel a house?
Remodelling a three-bed house takes an average of 20.9 weeks with an average of two tradespeople carrying out the work. Here’s a rough breakdown of the project:
- Demolitions take place early, lasting about five weeks.
- External and internal wall structures are built simultaneously.
- Windows and doors are installed, followed by internal doors and frames.
- Drainage and pipework progress alongside heating and cooling system installations.
- Electrical work, including wiring, fuse boards, and appliances, occurs mid-project.
- Ceiling and wall preparation, flooring, and kitchen installations follow.
- Joinery, decoration, and fixtures and fittings finalise the remodel in the last weeks.
As ever, progress heavily depends on the alignment of tradesmen at key stages. For instance, delays in external and internal wall construction in weeks 5–7 can push back heating and electrical work scheduled for the following weeks.

What is the difference between remodelling and renovating a house?
Remodelling and renovating are often used interchangeably, but they’re not the same. Renovating involves restoring or updating existing features, whereas remodelling alters the structure or floor plan—for example, removing walls to create an open-plan living, kitchen, and dining area.
Should I move out when remodelling a house?
It’s a good idea to move out during a home remodel, especially for larger projects. The disruption from contractors needing access at awkward times, the dust and debris, and the noise make for uncomfortable living. Additionally, at certain times, you’ll need to switch off the electricity to carry out work, which will leave you without power (and wi-fi!).
If plumbers are working, you’ll have no access to washing, cooking, or heating, which can be particularly challenging during the winter. Then, there are also safety concerns with power tools and other hazards being left out, especially if you have young children. It’s better to find alternative accommodation.